My WebLink
|
Help
|
About
|
Sign Out
PC-2026-08
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2026
>
PC-2026-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2026 8:27:46 AM
Creation date
8/4/2026 8:25:57 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
4/22/2026
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Hidden Canyon Residences and Preserve Project <br />Final EIR Responses to Written Comments <br /> <br /> <br />FirstCarbon Solutions 3-53 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/EIR/4 - Final EIR/21480016 Sec03-00 Responses to Written Comments.docx <br />Anonymous (ANONYMOUS) <br />Response to ANONYMOUS-1 <br />This comment provides general introductory statements and does not raise any specific issues with <br />respect to the proposed project or the Draft EIR. Please refer to Master Response 1, Non-CEQA <br />Issues Not Addressed in Final EIR, in Section 2, Master Responses, of this document. This Master <br />Response provides an explanation of the scope of CEQA, including conditions of approval. <br />Cumulative impacts for each environmental resource topic were evaluated at the end of each <br />environmental topic section of the Draft EIR. The Draft EIR determined that cumulative impacts <br />resulting from development of the proposed project would be less than significant with the <br />exception of transportation impacts related to VMT, which would be significant and unavoidable. <br />However, as stated in Draft EIR Section 3.14, Transportation, on page 3.14-13, the proposed project <br />would include VMT-reducing strategies such as reducing off-street parking spaces and enhancing <br />multimodal infrastructure. Moreover, this impact determination is consistent with the conclusions of <br />the City’s Housing Element Update EIR. The comment does not identify any specific cumulative <br />impact with which the commenter disagrees, nor does it propose any mitigation measures. This <br />comment is included in the administrative record and will be provided to the decision-makers for <br />review and consideration. The comment did not provide new, substantial evidence with respect to <br />the disposition of significant environmental impacts evaluated in the Draft EIR. Therefore, no further <br />response is required. <br />Response to ANONYMOUS-2 <br />Please refer to Master Response 1, Non-CEQA Issues Not Addressed in Final EIR, in Section 2, Master <br />Responses, of this document. This Master Response provides an explanation of the scope of CEQA. <br />The comment raises general concerns regarding cumulative increases in traffic, noise, and <br />neighborhood activity, but does not identify any specific CEQA threshold that would be exceeded or <br />provide substantial evidence of a significant cumulative impact. As discussed in Draft EIR Sections <br />3.11, Noise, and 3.14, Transportation, the Draft EIR evaluates existing conditions, including <br />background traffic and infrastructure-related noise, and analyzes both project-level and cumulative <br />impacts using adopted significance criteria. The analysis concludes that cumulative traffic and noise <br />impacts would not be significant, and the project’s contribution would not be cumulatively <br />considerable. The comment does not provide new or substantial evidence requiring revision of the <br />Draft EIR’s conclusions. <br />However, a Transportation Impact Study was prepared for the proposed project and included as <br />Appendix H (erroneously labeled ‘Noise Supporting Information;’ refer to Section 5, Errata, of this <br />document) of the Draft EIR. While not required under CEQA, this report included an Level of Service <br />(LOS) analysis. Appendix H includes count sheets conducted to collect existing peak-hour traffic <br />volumes. As stated on page 7 in Appendix H of the Draft EIR, motor vehicle traffic impacts resulting <br />from the proposed project were found to be less than significant based on the City’s LOS standards. <br />The anticipated proposed project traffic would result in roughly a 3 percent increase in peak-hour <br />traffic on Dublin Canyon Road at the Canyon Meadows Drive intersection, which would not <br />significantly affect existing conditions. All study intersections were found to operate at an acceptable <br />LOS under all study scenarios, with and without the proposed project, and traffic conditions resulting <br /> <br /><br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.