My WebLink
|
Help
|
About
|
Sign Out
PC-2026-08
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2026
>
PC-2026-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2026 8:27:46 AM
Creation date
8/4/2026 8:25:57 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
4/22/2026
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Hidden Canyon Residences and Preserve Project <br />Final EIR Responses to Written Comments <br /> <br /> <br />FirstCarbon Solutions 3-63 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/EIR/4 - Final EIR/21480016 Sec03-00 Responses to Written Comments.docx <br />Mary Jo Carreon (M.CARREON) <br />Response to M.CARREON-1 <br />A Transportation Impact Study was prepared for the proposed project and is included as Appendix H <br />of the Draft EIR. This study includes an analysis of traffic operations as a result of traffic signal <br />construction on Dublin Canyon Road. Page 7 of Appendix H states that the proposed signal would <br />improve operations at the intersection of Dublin Canyon Road and Canyon Meadows Drive. The <br />installation of a traffic signal at this intersection as part of a package of roadway improvements <br />intended to address existing and future traffic conditions, improve overall intersection safety, and <br />provide controlled and predictable access for all roadway users, including residents of Canyon <br />Meadows, Oak Hills Congregational Church, and through traffic on Dublin Canyon Road. <br />Specifically, during the peak-hours, the intersection would operate at LOS A for all “Plus Project” <br />conditions. As described on page 12 in Appendix H, LOS A represents a very low control delay where <br />many vehicles do not stop at all. Furthermore, the installation of the signal would improve roadway <br />safety by limiting concurrent vehicular path conflicts between Canyon Meadows Drive and the <br />existing church driveway and provide a protected pedestrian crossing across Dublin Canyon Road for <br />residents trying to access the nearby park. With respect to the commenter’s concern about left-turn <br />access from nearby residential developments, signalization is expected to improve overall traffic <br />operations by introducing defined gaps through signal phasing, rather than relying on opportunistic <br />merging during heavy traffic conditions. Therefore, the Transportation Impact Study concluded that <br />the signalized intersection would operate within acceptable parameters and would not result in <br />unsafe or unmanageable access conditions for adjacent neighborhoods and traffic impacts related to <br />the installation of a traffic signal for the proposed project would be less than significant. This <br />comment is included in the administrative record and will be provided to the decision-makers for <br />review and consideration. The comment did not provide new, substantial evidence with respect to <br />the disposition of significant environmental impacts evaluated in the Draft EIR. Therefore, no further <br />response is required. <br /> <br /><br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.