Laserfiche WebLink
City of Pleasanton—Hidden Canyon Residences and Preserve Project <br />Final EIR Responses to Written Comments <br /> <br /> <br />FirstCarbon Solutions 3-67 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/EIR/4 - Final EIR/21480016 Sec03-00 Responses to Written Comments.docx <br />Robert Devany 1 (R.DEVANY 1) <br />Response to R.DEVANY 1-1 <br />This comment is included in the administrative record and will be provided to the decision-makers <br />for review and consideration. Draft EIR Chapter 4, Effects Found not to be Significant, Section 4.2.1, <br />Agriculture Resources and Forestry Resources, page 4-2 states that the proposed project would <br />continue to provide access to Assessor’s Parcel Number (APN) 941-2600-1-3, located immediately <br />west of the project site boundary, through an access easement. This easement would allow existing <br />agricultural (grazing) activities to continue on the adjacent parcel upon project implementation. The <br />project applicant would be required to coordinate with the City and EBRPD regarding specifications <br />for this easement as a project condition of approval. Therefore, no impact related to agriculture or <br />forestry resources would occur. <br />Response to R.DEVANY 1-2 <br />Draft EIR Chapter 2, Project Description, Exhibit 2-2b displays the local vicinity of the project site <br />with the proposed project site plan. This exhibit includes aerial imagery, as well as project site <br />feature delineations. Exhibit 2-3 depicts the existing parcels within the project site. The parcel <br />number is provided for each property in the project site. Exhibit 2-2b and Exhibit 2-3 are not <br />intended to show land use designations, as that is displayed on Exhibit 2-4 in Chapter 2, Project <br />Description, of the Draft EIR. Exhibit 2-4 contains the land use designations for parcels within the <br />City and within Alameda County within the vicinity of the project site. Moreover, Draft EIR Section <br />3.10, Land Use and Planning, pages 3.10-1 through 3.10-3 include textual descriptions of land uses <br />within and surrounding the project site. This comment is included in the administrative record and <br />will be provided to the decision-makers for review and consideration. The comment did not provide <br />new, substantial evidence with respect to the disposition of significant environmental impacts <br />evaluated in the Draft EIR. Therefore, no further response is required. <br />Response to R.DEVANY 1-3 <br />As described in Draft EIR Chapter 1, Introduction, a Notice of Preparation (NOP) was provided to <br />agencies, including the County of Alameda (County), with potential jurisdiction over or expertise <br />related to the project in order to solicit input on the scope and content of the environmental <br />analysis. The County did not submit comments in response to the NOP during the scoping period. <br />Comments received from other agencies and members of the public (see Draft EIR Chapter 1, <br />Introduction, Table 1-1), were considered in determining the issues analyzed in the Draft EIR, <br />consistent with CEQA Guidelines Sections 15082 and 15083. Accordingly, the NOP circulation process <br />complied with CEQA requirements, and the County was afforded the opportunity to review and <br />comment on the proposed project during the scoping phase. Additionally, the Notice of Availability <br />for review of this Draft EIR was provided to the County. However, no comments on this Draft EIR <br />were received from the County. This comment is included in the administrative record and will be <br />provided to the decision-makers for review and consideration. The comment did not provide new, <br />substantial evidence with respect to the disposition of significant environmental impacts evaluated <br />in the Draft EIR. Therefore, no further response is required. <br />Response to R.DEVANY 1-4 <br />The City’s Planning Commission meeting for the proposed project occurred on December 10, 2025; <br />however, the public review period closed on January 20, 2026. The purpose of the public hearing <br />   <br /><br /> <br /> <br />