Laserfiche WebLink
P18-0078, P18-0079, P18-0081, PUD-130, and Tract 8569 PC-2026-09, April 22, 2026 <br /> <br />BUILDING AND SAFETY DIVISION – 925-931-5300 <br /> <br />42. PHASED OCCUPANCY: If building occupancy is proposed to be phased, the project <br />developer shall submit a phasing plan to the Chief Building and Safety Official for review <br />and approval. <br /> <br />43. BUILDING SURVEY: The project developer shall submit a building survey and/or record <br />of survey and a site development plan in accordance with the provisions of Chapter <br />18.68 of the PMC. These plans shall be approved by the Chief Building Official prior to <br />building permit issuance. The site development plan shall include all required <br />information to design and construct site, grading, paving, drainage, and utilities. <br /> <br />44. PAD AND SETBACK CERTIFICATION: The project developer shall submit a pad <br />elevation certification prepared by a California licensed land surveyor or registered civil <br />engineer to the Chief Building Official and Director of Community and Economic <br />Development certifying the pad elevations and building locations (setbacks) are <br />conforming to the approved plans, prior to receiving a foundation inspection for the <br />structures. <br /> <br />PUBLIC WORKS DEPARTMENT – 925-931-5650 <br /> <br />45. CONDITIONS OF APPROVAL: The Conditions of Approval shall be depicted on a plan <br />sheet(s) in the improvement plans. <br /> <br />46. ENGINEERING DIVISION FEES FOR SERVICE: The Engineering Division assesses <br />fees for services including plan-check, permit issuance, and inspection according to the <br />City’s adopted Master Fee Schedule. These fees are separate and distinct from fees <br />assessed by the Community Development Department (including Planning and Building <br />Division fees). The project developer is responsible for payment of all Engineering <br />Division fees prior to services rendered or permit issuance, whichever is first. (Address <br />this condition prior to plan approval). <br /> <br />Design <br /> <br />47. DESIGN PER CITY STANDARDS: All public improvements shall be designed in <br />compliance with the City Standard Specifications and Details in effect at the time of the <br />issuance of the encroachment, grading, or subdivision permit, whichever occurs first. All <br />public improvements shall be designed in conformance with the City of Pleasanton <br />Municipal Code and the City’s adopted Standard Specifications and Details in effect at <br />the time of issuance of the permit(s). Said standards are available for download at: <br />https://www.cityofpleasantonca.gov/our-government/public-works/engineering/. <br /> <br />48. ROADWAY DESIGN STANDARDS: All roads constructed or improved by the project <br />developer shall conform to the design standards contained in Pleasanton Municipal <br />Code Chapter 19.36. For standards not explicitly described in the Code, the following <br />State of California Department of Transportation (Caltrans) standards shall be followed: <br />Highway Design Manual, and the California Manual on Uniform Traffic Control Devices <br />    <br />  <br /> <br />