My WebLink
|
Help
|
About
|
Sign Out
PC-2026-12
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2026
>
PC-2026-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2026 4:21:26 PM
Creation date
8/4/2026 4:21:23 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/13/2026
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />P25-0300 PC-2026-12, May 13, 2026 <br /> <br /> <br />structure which was the subject of the SDR application; or the site is occupied if no <br />building permit or certificate of occupancy is required; or the applicant or his/her <br />successor has filed a request for extension with the Zoning Administrator pursuant to <br />the provisions of the Pleasanton Municipal Code. <br /> <br />3. CONDITIONS OF APPROVAL CHECKLIST: The applicant shall submit a “Conditions of <br />Approval Checklist” indicating all conditions in Exhibit A have been satisfied, <br />incorporated into the building permit plans or improvement plans, and/or addressed. <br />Said checklist shall be incorporated as one of the first four plan sheets of all building <br />permit and engineering permit plan submittals for review by the City prior to issuance of <br />permits. <br /> <br />4. APPEAL PERIOD: The building permit submittal will only be accepted after completion <br />of the appeal period provided in the Municipal Code, unless the applicant submits a <br />signed statement acknowledging that the plan check fees may be forfeited in the event <br />the approval is overturned on appeal, or the design is significantly changed as a result <br />of the appeal. In no case will a building permit be issued prior to the expiration of the <br />appeal period. <br /> <br />5. LIABILITY AND INDEMNIFICATION: To the extent permitted by law, the Project <br />applicant shall hold harmless, defend (with counsel acceptable to the City), and <br />indemnify the City, its City Council, its officers, commissions, employee and agents from <br />and against any claim, action, or proceeding brought by a third party against the <br />indemnified parties and/or the applicant to attack, set aside, or void the approval of the <br />Project, including the environmental review thereof, or any permit authorized hereby for <br />the Project, including without limitation, reimbursing the City its attorneys’ fees and <br />costs incurred in defense of the litigation. The City may, in its sole discretion, elect to <br />defend any such action with attorneys of its choice. <br /> <br />6. BUILDING PERMIT: Any signage plans shall be submitted to the Building and Safety <br />Division for review and approval prior to operation. The applicant shall obtain a building <br />permit prior to commencement of any work. (Project Specific Condition) <br /> <br />7. FEES: The applicant shall pay any and all fees to which the property may be subject, <br />prior to issuance of grading and/or building permits, or prior to recordation of the final <br />map, whichever is applicable. The type and amount of the fees shall be those in effect <br />at the time the permit is issued. <br /> <br />8. SCHOOL IMPACT FEES – COMMERCIAL: Prior to building permit issuance, the <br />applicant shall pay the required commercial development school impact fee as <br />prescribed by State law and as adopted by the Pleasanton Unified School District <br />(PUSD). <br /> <br /> <br /> <br /> <br /> <br /><br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.