My WebLink
|
Help
|
About
|
Sign Out
PC-2026-16
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2026
>
PC-2026-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2026 4:40:09 PM
Creation date
8/4/2026 4:39:51 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/24/2026
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PC-2026-16 June 24, 2026 <br /> <br />Ongoing Monitoring and Enforcement: All mitigation measures shall be monitored <br />in accordance with the adopted MMRP. The Applicant shall be responsible for all <br />costs associated with implementation, monitoring, and reporting. The Applicant <br />shall create and provide a mitigation measures checklist indicating all mitigation <br />measures have been satisfied, incorporated into the building permit plans or <br />improvements plans, and/or addressed. Said checklist shall be incorporated as <br />one of the first four plan sheets of all building permit and engineering permit plan <br />submittals for review by the City prior to issuance of permits. Compliance shall be <br />verified by the City prior to issuance of applicable permits and throughout <br />construction and operation, as specified. Project Specific Condition <br /> <br />10. HAZARD AND HAZARDOUS MATERIAL HANDLING: The following conditions <br />were identified for implementation in the EIR prepared with regard to the Arroyo <br />Lago Residential Project (SCH 2023050339) and apply to the Project: <br />a. During site redevelopment, the Applicant shall implement corrective <br />actions and soils management protocols identified in the Final Soil Report <br />submitted to the Alameda County Department of Environmental Health <br />(“ACDEH”) for review and approval. <br />b. Prior to the start of site grading, the Applicant shall submit the project <br />schedule to the Alameda County Department of Environmental Health <br />(“ACDEH”) for review and approval. <br />c. Prior to the import of soil to the project site, the Applicant shall submit soil <br />import documentation to the ACDEH for review and approval. <br />d. Prior to the reuse of excavated stockpile material on the project site, the <br />Applicant shall submit a Stockpile Characterization Sampling, Evaluation, <br />and Reuse Plan to the ACDEH for review and approval. <br />e. Prior to the beginning of construction, the Applicant shall submit a soil <br />excavation report to the ACDEH for review and approval. Project Specific <br />Conditions <br /> <br />PLANNING DIVISION – 925-931-5600 <br /> <br />11. USES: Uses allowed and conditionally allowed within the Project shall be those <br />of the One-Family Residential zoning district. <br /> <br />12. RECORDED DISCLOSURES: The recorded Declaration of Covenants, <br />Conditions & Restrictions of the Project (the “CC&Rs”) shall contain the following: <br /> <br />A clause indicating the close proximity of the Pleasanton Garbage Services <br />Transfer Facility, Vulcan Materials Company, City’s Public Works – <br />Operation Services, Livermore-Pleasanton Fire Department training facility, <br />Pleasanton Police training facility, and Union Pacific Railroad; the possible <br />impacts to homes due to activities at these facilities; and a notification of the <br />potential for noise, odor, dust and vibration generated from the operations at <br />these facilities. <br /> <br /><br /><br /><br />
The URL can be used to link to this page
Your browser does not support the video tag.