Laserfiche WebLink
PC-2026-16 June 24, 2026 <br />and any other mechanical equipment, whether on the structure, on the ground, or <br />on the roof, with materials architecturally compatible with the relevant building. <br />Screening details shall be shown on the plans submitted for the relevant building <br />permit, the adequacy of which shall be determined by the City Engineer and <br />Director of Community and Economic Development. All required screening shall <br />be installed prior to final occupancy of the relevant building permit. <br /> <br />Recycling and Composting <br /> <br />25. RECYCLING AND COMPOSTING PROGRAMS: The Project shall comply with <br />the current City/Pleasanton Garbage Service recycling and composting <br />programs. <br /> <br />Green Building and Sustainability Measures <br /> <br />26. CLIMATE ACTION PLAN (“CAP”) 2.0 COMPLIANCE: The Project <br />shall comply with CAP 2.0 requirements of providing all electric homes and <br />providing battery storage backup system. Prior to building permit issuance for the <br />first residential building, a GHG Emission Compliance Checklist shall be provided <br />in compliance with CAP 2.0 to the Planning Division for review and approval by <br />the Director of Community and Economic Development. The measures shall be <br />shown on the building permit plans submitted to the Building and Safety Division. <br />The Checklist shall include notation indicating the sheet(s) the measure can be <br />found. Prior to the relevant building permit final, all of the relevant measures <br />indicated on the approved checklist shall be inspected and approved by the City <br />of Pleasanton. <br /> <br />27. GREEN BUILDING; The applicant shall submit GreenPoint Rated Checklist from <br />BuildItGreen.org:((https://archive.builditgreen.org/greenpoint-rated/documents- <br />checklists) and is subject to review and approval by the Director of Community <br />and Economic Deveclopment prior to issuance of a building permit. <br /> <br />Construction Practices and Noticing <br /> <br />28. WORK HOURS: All demolition and construction activities, inspections, plan <br />checking, material delivery, staff assignment or coordination, etc., shall be limited <br />WRWKHKRXUVRIௗDPWRSP0RQGD\WKURXJK)ULGD\1RFRQVWUXFWLRQVKDOOEH <br />allowed on State or Federal Holidays or Saturdays or Sundays. The Director of <br />Community and Economic Development may allow earlier “start times” or later <br />“stop times” for specific construction activities, e.g., concrete pouring. All <br />construction equipment shall meet Department of Motor Vehicles (“DMV”) noise <br />standards and shall be equipped with muffling devices. Prior to construction, the <br />hours of construction shall be posted on site. <br /> <br />29. CONSTRUCTION PARKING: Campers, trailers, motor homes, or any other <br />similar vehicles are not allowed on the construction site except when needed as <br />        <br /><br /><br /><br />