Laserfiche WebLink
PC-2026-16 June 24, 2026 <br />Department of Transportation Pipeline and Hazardous Materials Safety <br />Administration (US DOT PHMSA) <br /> <br />88. POLLUTANT REDUCTION IN STORMWATER: At no time during construction of <br />the project shall pollutants be allowed to enter, clog, or contaminate storm drain <br />pipe networks or open stormwater channels in violation of Pleasanton Municipal <br />Code §9.14.080 et seq. The Applicant shall contain all trash and debris for proper <br />disposal to authorized landfills or recyclers. Erosion control features shall be <br />deployed during the rainy season that extends from October 1st to April 15th each <br />year, or any time rain is forecast outside of this period. Best Management <br />Practices (BMPs) shall be strictly followed. Street sweepers must be employed if <br />soil or debris is tracked onto the public roads from vehicles exiting the site. <br />Standard BMPs are available from the California Stormwater Quality Association <br />(CASQA), the United States Environmental Protection Agency (EPA), Caltrans, <br />and others. Notes and/or illustrations shall be added to the plans that describe <br />the BMPs to be utilized during construction. The use of manufactured erosion <br />control woven blankets and straw wattles that utilize plastic monofilament netting <br />is specifically prohibited. (Fulfill this condition during construction.) <br /> <br />89. SWPPP REPORTING: Copies of any monitoring and/or sampling reports <br />required by the stormwater pollution prevention plan (SWPPP) and submitted by <br />the Legally Responsible Person (LRP) to the State of California’s SMARTS <br />database shall also be submitted to the City of Pleasanton inspector assigned to <br />the project. The LRP shall also submit to the City a copy of the required Annual <br />Report no later than September 1st of each year that construction is active or <br />when erosion control features have been deployed. The report must include a <br />summary of all sampling and analysis performed (Risk Levels 2 and 3 only), a log <br />of all inspections performed, a summary of any required corrective actions taken, <br />and a summary of any violations. (Fulfill this condition during construction.) <br /> <br />90. DUST CONTROL: Dust control measures must be employed during all phases of <br />construction to prevent airborne nuisance to neighboring properties. All <br />stockpiles or unused materials that can create dust shall be covered or removed. <br />Exposed soil areas shall be routinely watered until surfacing materials or <br />landscaping is installed. Use of dust palliatives shall conform to Caltrans <br />Standard Specification Section 18. Any damage caused by airborne dust to <br />neighboring properties shall be cleaned with costs paid by the Applicant. If the <br />Applicant fails the address dust as directed by the City, the City shall have the <br />right to enter the property to effectuate the correction, with all costs paid by the <br />applicant or levied as a lien against the Applicant’s property. (Fulfill this condition <br />during construction.) <br /> <br />91. PROPERTY NUISANCE: At no time during construction of the project shall the <br />condition of the property become a nuisance as defined in Pleasanton Municipal <br />Code §9.28.020. The City shall have the right to inspect the property for <br />conditions that violate the code standard. If a nuisance is found, the Applicant <br />        <br /><br /><br /><br />