Laserfiche WebLink
PC-2026-16 June 24, 2026 <br />115. TRAFFIC IMPACT FEES: The Applicant shall pay all applicable traffic impact <br />fees for the Project as required under applicable law and calculated as outlined in <br />Pleasanton Municipal Code 3.26.050 “Amount of Fee”. The fee shall be reduced <br />by the amount of any credit authorized by Section 3.26.070 of the Pleasanton <br />Municipal Code and as defined by the Pre-Annexation and Development <br />Agreement, dated ____________, 2026. Should credits exceed the amount of <br />the fee, a reimbursement may be given pursuant to Section 3.26.080 of the <br />Pleasanton Municipal Code. The fee shall be paid prior to building permit <br />issuance. Project Specific Condition <br /> <br />116. TRAFFIC CONTROL PLAN (TCP): Comprehensive traffic control measures shall <br />be implemented pursuant to Pleasanton Municipal Code section 13.04.240 and <br />13.04.250 during construction, including scheduling of major truck trips and <br />deliveries, to avoid peak travel hours. If necessary, as determined by the Traffic <br />Engineer, proper lane closure procedures such as flagger stations, signage, <br />cones, and other warning devices shall be implemented during construction. <br />Project Specific Condition <br /> <br />117. TRUCK ROUTES: The haul route for all materials to and from the Project site <br />shall be approved by the City’s Traffic Engineer prior to issuance of a building <br />permit, and shall include the provision to monitor the street surfaces used for the <br />haul route so that any damage and debris attributable to the haul trucks is <br />identified and corrected at the expense of the Project Applicant. <br /> <br />118. SIGNAGE AND STRIPING: The plans submitted to the Building and Safety <br />Division for plan check shall include improvement plans for this Project that <br />contain signage and striping details for both on- and off-site. Said improvement <br />plans shall be subject to the review and approval of the City Traffic Engineer prior <br />to building permit issuance. <br /> <br />119. Street A Improvements: The Applicant shall construct the extension of the trail <br />along the east side of Street A from Street D to Busch Rd. The design shall meet <br />the standards within the Bicycle and Pedestrian Master Plan and the Trails <br />Master Plan. In addition, ADA curb ramps and crosswalks shall be constructed <br />on the north, south and east legs of the roundabout at the intersection of Street A <br />and Street F. As a condition precedent to approval of the final map, the City and <br />the applicant shall enter into a subdivision improvement agreement, subject to <br />the City's bonding requirements, for the completion of the Street A <br />improvements. The improvements on Street A shall be completed no later than <br />issuance of the building permit for the 100th residential unit in the Project <br />(including model homes, but exclusive of ADUs) or within two years of issuance <br />of the first building permit for the Project (including model homes), whichever <br />comes first. Project Specific Condition <br /> <br />        <br /><br /><br /><br />