Laserfiche WebLink
ARROYO LAGO RESIDENTIAL PROJECT <br />ADDENDUM <br /> <br /> <br />FCS 137 <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480036/Addendum/21480036 Arroyo Lago Residential Project Addendum.docx <br />Approximately 20 percent of Zone 7’s water supplies come from groundwater, with the rest coming <br />from surface water sources.37 Groundwater supply is pumped from the Livermore Valley Groundwater <br />Basin. The basin is not adjudicated and is not considered to be critically overdrafted; it is instead <br />considered a medium-priority groundwater basin. As such, the basin is regulated under the <br />Sustainable Groundwater Management Act (SGMA), and the preparation and implementation of a <br />Groundwater Sustainability Plan (GSP) is required. Zone 7 has an approved GSP for the Livermore <br />Valley Groundwater Basin, which identifies projects, practices, and goals related to management of <br />groundwater supplies.38 Adherence to the applicable objectives and sustainability goals provided in <br />the GSP would reduce impacts to groundwater quality within the City. Further, the proposed project <br />would not include any on-site wells that would draw groundwater for proposed project operations. <br />Therefore, impacts related to groundwater recharge and supply would be less than significant, <br />consistent with the analysis and impact conclusions in the Prior FEIR. Therefore, the proposed <br />project would not introduce new significant impacts or create substantially more severe significant <br />impacts than those previously identified in the Prior FEIR. No additional analysis is required. <br />c) Drainage <br />Would the project: Substantially alter the existing drainage pattern of the site or area, <br />including through the alteration of the course of a stream or river or <br />through the addition of impervious surfaces, in a manner which <br />would: <br />i) result in substantial erosion or siltation on- or off-site; <br />ii) substantially increase the rate or amount of surface runoff in a <br />manner which would result in flooding on- or off-site; <br />iii) create or contribute runoff water which would exceed the <br />capacity of existing or planned stormwater drainage systems or <br />provide substantial additional sources of polluted runoff. <br />Prior FEIR Conclusions <br />The Prior FEIR found that construction activities within the project site could result in substantial <br />erosion or siltation, leading to drainage pattern alteration and the increased potential for polluted <br />runoff to enter nearby water bodies. However, the County Project would be required to comply with <br />the regulations of its NPDES permit. Additionally, the County Project would be required to comply with <br />construction-phase BMPs and requirements for erosion and sedimentation control plans. The County <br />Project would be required to design and implement a SWPPP to ensure that erosion, siltation, and <br /> <br />operation. The City is actively evaluating future supply alternatives, including potential joint groundwater wells in <br />coordination with Zone 7; however, at present, all water supplies are purchased from Zone 7. <br />37 Zone 7 Water Agency (Zone 7). 2021. 2020 Urban Water Management Plan. June. <br />38 Zone 7 Water Agency (Zone 7). 2021. Alternative Groundwater Sustainability Plan for the Livermore Valley Groundwater <br />Basin. December.