Laserfiche WebLink
ARROYO LAGO RESIDENTIAL PROJECT <br /> ADDENDUM <br /> <br /> <br />154 FCS <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480036/Addendum/21480036 Arroyo Lago Residential Project Addendum.docx <br />General Plan Noise Element identifies that an increase of 4 dBA over existing ambient conditions is <br />considered a threshold for significance. <br />The proposed project would result in substantially the same mechanical ventilation equipment <br />compared to the County Project albeit with a nominal decrease given the slight reduction in units. <br />Based on noise measurements, ambient noise levels are documented as being 59 dBA CNEL near <br />the southwest portion of the project site, with daytime short-term ambient noise measurements <br />ranging from 45.2 dBA to 57.1 dBA Leq across the site. Based on the proposed site plan, none of the <br />mechanical systems would be located closer to off-site receptors than what was previously analyzed <br />as the reasonable worst-case scenario. The modeled noise level for mechanical equipment was 44 <br />dBA L eq as measured at the exterior of the nearest sensitive receptor. This reasonable worst-case <br />stationary source operational noise level would not result in an increase of more than 4 dBA over <br />documented existing ambient noise conditions identified above and is therefore consistent with the <br />noise performance standard of Program 1.3. Therefore, consistent with the impact conclusions of the <br />Prior FEIR, the proposed project’s mechanical ventilation equipment operational noise impacts would <br />be less than significant. <br />The proposed project’s construction and operational noise impact would continue to be less than <br />significant, and the proposed project would not introduce any new significant impacts or create <br />substantially more severe significant impacts than those previously identified in the Prior FEIR. No <br />additional analysis is required. <br />b) Groundborne Vibration <br />Would the project result in: Generation of excessive groundborne vibration or <br />groundborne noise levels? <br />Prior FEIR Conclusions <br />The Prior FEIR evaluated vibration impacts using FTA criteria because the County does not have any <br />quantitative applicable standards for construction or operational vibration thresholds. As detailed <br />more fully therein, the nearest residences are not expected to experience vibration levels exceeding <br />the thresholds for structural damage or annoyance. Construction equipment such as graders and <br />trucks would operate at distances sufficient to avoid excessive vibration. Therefore, the Prior FEIR <br />concluded that groundborne vibration impacts would be less than significant. (Draft EIR, pp. 3.12-24, <br />6-17). <br />Proposed Project Analysis and Conclusion <br />Construction Vibration Impacts <br />Pleasanton General Plan Noise Element Program 1.6 requires preparation of a vibration study by a <br />qualified vibration consultant, with a site-specific engineering assessment for any proposed <br />construction project that would require pile driving or similar vibration causing impacts. The <br />assessment would minimize potential vibration impacts through such measures as pre-drilling pile <br />hoses, driving piles hydraulically or enclosing sheet piles with rubber aprons. The City Engineer <br />would review and approve all vibration studies. However, the proposed project would not include use