Laserfiche WebLink
ARROYO LAGO RESIDENTIAL PROJECT <br />ADDENDUM <br /> <br /> <br />FCS 3 <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480036/Addendum/21480036 Arroyo Lago Residential Project Addendum.docx <br />substantial importance has occurred. Therefore, preparation of a subsequent or supplemental EIR is <br />not required. <br />This Addendum, checklist, and attached documents constitute substantial evidence supporting the <br />conclusion that preparation of a supplemental or subsequent EIR is not required. <br />1.2.1 - Findings <br />There are no substantial changes to the Prior FEIR that would be triggered by the minor revisions to <br />the County Project that are reflected in the proposed project, nor are there circumstances in which the <br />proposed project would be undertaken that would require major revisions of the Prior FEIR. The <br />proposed revisions do not require preparation of a subsequent or supplemental EIR due to either (1) <br />the involvement of new significant environmental effects, (2) a substantial increase in the severity of <br />previously identified significant effects, or (3) new information of substantial importance. No mitigation <br />measures or alternatives previously found not to be feasible would in fact be feasible, nor has the <br />Prior FEIR proponent declined to adopt any additional mitigation measures or alternatives that would <br />substantially reduce one or more significant effects on the environment. Applicable mitigation <br />measures from the Prior FEIR are identified and discussed in this Addendum as well as related <br />implementation measures to ensure compliance therewith, which would be implemented by the <br />proposed project. <br />As illustrated herein, the proposed project is consistent with and within the scope of the certified Prior <br />FEIR and would involve only minor changes to the County Project comprehensively studied in the <br />Prior FEIR; therefore, an Addendum is the appropriate CEQA document for the proposed project. <br />1.2.2 - Conclusions <br />The impacts of the proposed project remain within the impacts previously analyzed in the Prior FEIR <br />(CEQA Guidelines § 15164), and therefore no subsequent or supplemental EIR is required. <br />1.3 - Mitigation Monitoring Program <br />As required by Public Resources Code Section 21081.6 (a)(1), a Mitigation Monitoring and Reporting <br />Program (MMRP) has been prepared for the proposed project in order to monitor the implementation <br />of the mitigation measures that have been adopted for the proposed project. Any long-term <br />monitoring of mitigation measures imposed on the overall development will be implemented through <br />the MMRP.