Laserfiche WebLink
ARROYO LAGO RESIDENTIAL PROJECT <br /> ADDENDUM <br /> <br /> <br />168 FCS <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480036/Addendum/21480036 Arroyo Lago Residential Project Addendum.docx <br />e) Other Public Services <br />Would the project: Result in substantial adverse physical impacts associated with the <br />provision of new or physically altered governmental facilities, need <br />for new or physically altered governmental facilities, the <br />construction of which could cause significant environmental <br />impacts, in order to maintain acceptable service ratios, response <br />times or other performance objectives for any of the public <br />services: Other public services? <br />Prior FEIR Conclusions <br />The Prior FEIR determined that the County Project would increase demand for library services as <br />compared to existing conditions. Consultation with the Alameda County Library and Pleasanton <br />Public Library indicated that the additional demand would be minimal and could be accommodated <br />without the need for new or expanded facilities. Therefore, the Prior FEIR concluded that impacts <br />would be less than significant. (Draft EIR, pp. 3.13-16, 6-18, 6-19). <br />Proposed Project Analysis and Conclusion <br />Consistent with the County Project, the proposed project could result in an increased demand for <br />library services as compared to existing conditions. However, the proposed project would slightly <br />reduce the number of units from that proposed by the County Project and would result in a <br />corresponding nominal decrease in new residents generated. <br />As stated in the Prior FEIR, the Pleasanton Public Library was consulted in a letter dated May 19, <br />2023 and confirmed that the proposed project would not have a substantial impact on the library and <br />that the library would be able to accommodate the proposed project as part of the existing facilities. <br />The City identified the need for expansion of the Pleasanton Library. However, the City’s General Plan <br />and Library Master Plan indicate a planned expansion of the Pleasanton Public Library. Pleasanton <br />Public Library is supported by the City’s General Fund and grant funding at approximately $4 million <br />annually. Thus, the need for an expansion of the library facilities is not necessitated by the proposed <br />project and is an existing deficiency. The need for additional library services have already been <br />analyzed in the General Plan EIR and the Housing Element Update Program EIR. Therefore, <br />consistent with the Prior FEIR’s impact conclusion, the proposed project’s impact in this regard would <br />be less than significant and, as such, would not introduce new significant impacts or create <br />substantially more severe significant impacts than those previously identified in the Prior FEIR. No <br />additional analysis is required. <br />Zone 7 Stormwater Option <br />Because the Zone 7 Stormwater Option is limited to a modification in stormwater management <br />infrastructure and does not alter the proposed project’s residential development program or the scale <br />or nature of development, impacts would remain less than significant with respect to public services.