My WebLink
|
Help
|
About
|
Sign Out
PC-2026-15
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2026
>
PC-2026-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2026 12:52:06 PM
Creation date
8/5/2026 12:48:39 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/24/2026
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ARROYO LAGO RESIDENTIAL PROJECT <br />ADDENDUM <br /> <br /> <br />FCS 25 <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480036/Addendum/21480036 Arroyo Lago Residential Project Addendum.docx <br />2.3.4 - Proposed Off-site Improvements <br />The proposed project would also include off-site improvements, as described below. Additional off-site <br />improvements are discussed in Section 2.3.7, Proposed Utilities. <br />Roadway, Bicycle, and Pedestrian Improvements <br />A separate approved and entitled project, known as the Villages at the Quarry Project, located south <br />of Busch Road, was approved by the City of Pleasanton on April 23, 2025. The Villages at the Quarry <br />Project is required to make various roadway, bicycle, and pedestrian improvements to Busch Road, <br />including bike lanes, sidewalks, a Class IV multiuse path, roundabouts into both the Villages at the <br />Quarry Project and the proposed project’s entrances, and a dedicated queueing lane for the PGS <br />facility. <br />If the proposed project is approved, the approval documents would include a binding provision in the <br />Pre-Annexation Development Agreement (PADA) obligating the Arroyo Lago project applicant to <br />implement the Busch Road improvements identified above and codified in Condition 14516 of the <br />Villages at the Quarry approval, in the event that the Villages at the Quarry Project does not move <br />forward or if the proposed project develops first. In addition to project-specific on-site and off-site <br />improvements, the project applicant would financially contribute to future planned improvements <br />along El Charro Road. <br /> <br />16 Condition 145 from the Villages at the Quarry Project reads as follows: The Project shall construct Busch Road along the <br />entirety of the Project frontage, as a two-lane roadway, in accordance with Section 19.36.050 of the Pleasanton <br />Municipal Code, inclusive of a single-lane roundabout which is the appropriate means of traffic control for safe and <br />efficient operation of the intersection of Busch Road and Street D (“Busch Road Improvements”). The roundabout shall <br />be designed to fit entirely within the existing right-of-way without requiring any dedication of additional right(s)-of-way by <br />developer or third parties. As a condition precedent to approval of the final map, the City and the applicant shall enter into <br />a subdivision improvement agreement, subject to the City’s bonding requirements, for the completion of the Busch Road <br />Improvements. The Busch Road Improvements shall be eligible for a fee credit in accordance with Pleasanton Municipal <br />Code Section 3.26.070. Should the applicable fee credits exceed the required transportation development fee, the <br />applicant shall be entitled to reimbursement pursuant to a reimbursement agreement in accordance with Pleasanton <br />Municipal Code Section 3.26.080.
The URL can be used to link to this page
Your browser does not support the video tag.