Laserfiche WebLink
ARROYO LAGO RESIDENTIAL PROJECT <br />ADDENDUM <br /> <br /> <br />FCS 51 <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480036/Addendum/21480036 Arroyo Lago Residential Project Addendum.docx <br />Domestic Water <br />Water service for the proposed project would be provided by the City via connection to an existing 12- <br />inch diameter water line along Busch Road and an off-site existing 16-inch diameter water line on <br />Mohr Avenue. To access the existing water line in Mohr Avenue, as shown in Exhibit 9c, the proposed <br />project would construct a new 12-inch diameter water line extending from the northwest corner of the <br />project site, following the existing utility road, to Mohr Avenue. <br />Stormwater Drainage <br />Two options are being studied for handling the proposed project’s stormwater drainage: one involving <br />conveyance to the City’s existing storm drain system (City Stormwater Option) and the second option <br />involving the stormwater discharging into Zone 7’s facilities (Zone 7 Stormwater Option). The Zone 7 <br />Stormwater Option would be subject to Zone 7 approval. Both options are described further below.19 <br />City Stormwater Option <br />Stormwater generated by the proposed project would be collected via 6-inch storm gutters along the <br />proposed internal streets and conveyed through an on-site network of 18-inch underground storm <br />drain pipes to the City’s existing storm drain system. Under normal operating conditions, stormwater <br />would be conveyed via an approximately 45-inch diameter pipe to a proposed primary bioretention <br />area located approximately 0.45 mile east of the project site, adjacent to El Charro Road (Exhibits 9b <br />and 9d). The applicant would be responsible for the maintenance and ongoing operations of this <br />facility in compliance with City standards as conditioned through the Conditions of Approval or the <br />PADA . <br />The primary bioretention area would include a treatment area of approximately 40,000 square feet. <br />The bioretention area would contain two layers: an approximately 18-inch layer of bioretention soil <br />mix and an approximately 12-inch layer of Class II permeable rock. After being treated, the <br />stormwater would be pumped out of the bioretention basin into a storm drain force main that would be <br />located in El Charro Road and would flow south to Busch Road where it would flow west and connect <br />to an existing City storm drainpipe in Busch Road (Exhibit 9a). <br />In larger storm events, stormwater would be temporarily stored in a detention basin just northeast of <br />the bioretention area. The detention basin has been sized to accommodate back-to-back 100-year <br />storm events in accordance with all applicable standards and requirements, allowing stormwater <br />discharge to be metered to ensure that the capacity of the City’s storm drain system is not exceeded. <br />In addition to the normal stormwater system, the proposed project is also designed with overland <br />release, which includes a path for surface floodwater to flow through the development in a manner <br />that protects structures should the underground storm drain system be blocked or overwhelmed. <br /> <br />19 The proposed project would implement one of the two stormwater options, and thus, both stormwater options are being <br />considered in this Addendum for purposes of a conservative analysis.