Laserfiche WebLink
4.1 Evening Occupancy Schedule <br />Time Staff Arrivals Departures Devotees Total <br />Occupancy <br />6:00–6:30 5 5 0 5 10 <br />6:30–7:00 5 6 2 9 14 <br />7:00–7:30 5 6 3 12 17 <br />7:30–8:00 5 5 2 15 20 <br />8:00–8:30 5 4 6 13 18 <br />8:30–9:00 5→0 2 10 5 5 <br />5. Parking Analysis <br />The project provides 24 on-site parking spaces. Peak demand is estimated at 8–10 <br />vehicles, which is significantly below available capacity. No spillover or street parking is <br />anticipated. <br />6. Traffic & Circulation <br />Traffic generation is minimal due to staggered attendance. Peak occurs after 7:00 PM, <br />when surrounding business activity has declined. <br />7. Operational Controls <br />Occupancy capped at 30 persons. Staggered attendance. No outdoor activity. No <br />amplified sound. <br />8. Findings for MCUP Approval <br />8.1 Consistency with Zoning Intent <br />The proposed use is a low-intensity indoor religious facility compatible with surrounding <br />commercial and light industrial uses. <br />8.2 No Adverse Impact <br />The project avoids impacts through limited occupancy, indoor-only activities, and <br />controlled scheduling. <br />8.3 Parking Adequacy <br />Parking demand is significantly below the available 24 spaces, ensuring no impact on <br />surrounding properties. <br />8.4 Traffic & Circulation <br />Peak activity occurs after business hours with staggered attendance, resulting in <br />negligible traffic impact. <br />8.5 Compatibility with Surroundings <br />The use operates during off-peak hours and maintains low intensity, ensuring compatibility <br />with adjacent tenants. <br />8.6 Operational Controls <br />Strict controls on occupancy, hours, and activity ensure continued compliance. <br />9. Conclusion <br />The proposed project is a low-impact, well-managed use that satisfies all criteria for Minor <br />Conditional Use Permit approval.