Laserfiche WebLink
<br /> 8 <br />required essential nexus existed; and (2) also need to demonstrate the basis for the proposed <br />50-50 allocation was reasonably proportionate. Both of the foregoing elements must be <br />established, which becomes even more challenging given the few remaining development <br />proposals that may move forward in the East Pleasanton Specific Plan area (thereby <br />resulting in a tremendous cost burden being imposed on relatively few private parties), and <br />the City’s inability to contribute its “portion” due to substantial budgetary constraints. <br />For the reasons set forth herein and further supported by a thoughtful review of the <br />record, the necessary legal findings cannot be made to support the foregoing position with <br />respect to the Project. In particular: <br />• Failure to establish essential nexus: While the Future El Charro Extension would <br />undoubtedly benefit the City’s overall traffic network and has been contemplated <br />as important regional traffic infrastructure since the 1990s, the record does not <br />demonstrate (1) that the Project triggers this improvement, (2) to what extent the <br />extension would also distinctly and specifically benefit the eventual residents and <br />other users of the Project, or (3) why a more modest set of improvements (e.g., two <br />lanes instead of four; extension of Busch Road to Stanley Boulevard only) would <br />not be sufficient. <br />• Failure to establish any evidence of proportionality: Even if one assumes arguendo <br />there is a connection between the impacts of the Project and the Future El Charro <br />Extension, the lack of proportionality is patent. <br />o Because of the nature of these regional improvements and the <br />enormous costs associated therewith, on their face, the City’s past <br />demands clearly exceeded any reasonable notion of proportionality. <br />This is particularly apparent given that the City has not committed to <br />any contribution, and there is a paucity of other developments upon <br />which the City has the legal right to impose fair share obligations <br />thereon. <br /> <br />o The asserted 50-50 allocation appears arbitrary, coming to fruition <br />entirely “per direction from the City”; recent attempts via the 2025 F&P <br />Report to justify this allocation seem pretextual at best. <br />o The 2025 F&P Report clearly suggests that the Future El Charro <br />Extension could function adequately as a two-lane road. The <br />implication that necessarily follows from this conclusion is that even if <br />there were some nexus to the Project for a two-lane road (which there <br />is not), the proposed four-lane road would be oversized for the benefit <br />of all City residents. <br />Given the long-planned nature of the Future El Charro Extension as backbone infrastructure <br />to serve the existing and planned future growth of the City and the broader region <br />(contemplated since at least the 1990s), combined with the paucity of information or data to <br />support any legal nexus between the Future El Charro Extension and the Project or the <br />proposed 50-50 allocation, there is no basis under applicable law for the City to require <br />Developer to contribute any amounts towards the costs of the Future El Charro Extension <br />due to the failure to satisfy the requisite legal tests.