My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL SPECIAL MEETING AGENDA PACKET 8-11-26
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
081126 SPECIAL
>
CITY COUNCIL SPECIAL MEETING AGENDA PACKET 8-11-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2026 9:09:20 AM
Creation date
8/7/2026 8:56:02 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/11/2026
DESTRUCT DATE
15Y
DOCUMENT NAME
SPECIAL MEETING AGENDA PACKET
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 5 <br />2026. The feasibility phase of the Groundwater Supply Project is complete, the design of the <br />Emergency Power Improvements Project is complete, and construction for the latter is <br />anticipated to start by the end of 2026. <br /> <br />In 2025, the City was awarded a $1 million State grant to fund approximately 70 percent of the <br />feasibility phase costs for the Groundwater Supply Project. The feasibility phase was <br />completed in early 2026, and staff anticipate presenting the negotiated agreements to the City <br />Council for consideration in September 2026, subject to successful completion of negotiations <br />with Zone 7. Because of delays in the start of the design and construction of the Groundwater <br />Supply Project, a portion of the remaining 2024 Water Revenue Bond proceeds will instead be <br />used to advance Phase 1 of the Water Meter and Advanced Metering Infrastructure (AMI) <br />System Replacement Program, including proof-of-concept testing and replacement of failed <br />water meters. Phase 1 is expected to replace approximately 25 percent of the City's meter <br />inventory by the end of 2026. With the current project delivery schedule, staff expects to <br />expend or encumber the 2024 Water Revenue Bond in 2027. <br /> <br />Water Fund <br />The City’s Water Fund is operated as an enterprise fund to deliver potable water. The City <br />Council adopted new water rates on October 7, 2025, for the next four years, beginning in <br />January 2026. The adopted rates were based on revenue adjustments of 15 percent increases <br />in each of Calendar Year 2026 and 2027, and 8 percent increases in each of Calendar Year <br />2028 and 2029. The water rate increases were adopted to ensure the long-term financial <br />sustainability of the City's water utility by providing sufficient funding for daily operations, debt <br />service, infrastructure rehabilitation and replacement, regulatory compliance, and future capital <br />improvements identified in the WSMP. The updated rates also support appropriate reserve <br />levels while balancing affordability, revenue stability, and water conservation objectives. The <br />proposed issuance of debt was incorporated into the new rate increases. <br /> <br />2026 Water Revenue Bonds <br />Following completion of the City’s Water System Management Plan (WSMP) in 2024, the City <br />completed a comprehensive water rate study in 2025. The study identified the need to issue <br />approximately $35 million in additional debt financing through 2030 to implement the City's <br />water capital improvements. The anticipated financing schedule includes approximately $15 <br />million in FY 2026/27, $10 million in FY 2027/28, and $10 million in FY 2028/29. <br /> <br />Major projects anticipated to be funded through the proposed 2026 Water Revenue Bonds <br />include: <br />• Water Meter and Advanced Metering Infrastructure (AMI) System Replacement; <br />• Design and construction of City Groundwater Supply Project; <br />• Completion of construction of Water System Emergency Power Improvements; <br />• Annual Water Distribution System Improvements; and <br />• Other water system capital improvements <br /> <br />As some of the projects are in active implementation using a portion of the unspent proceeds <br />from the 2024 Water Revenue Bonds, certain costs related to the Water System capital <br />improvement projects will be incurred before the 2026 Bonds are issued. Therefore, the City is <br />required to adopt a resolution declaring its official intent to reimburse such expenditures from <br />Page 224 of 373