Laserfiche WebLink
WATER EFFICIENT LANDSCAPE WORKSHEET <br /> <br />ETAF CALCULATIONS <br />REGULAR LANDSCAPE AREA <br />TOTAL ETAF x AREA <br />TOTAL AREA <br />AVERAGE ETAF <br />ALL LANDSCAPE AREA <br />TOTAL ETAF x AREA <br />TOTAL AREA <br />SITEWIDE ETAF <br />HYDROZONE #/ PLANTING DESCRIPTION <br />E.G. <br />1.) FRONT LAWN <br />2.) LOW WATER USE PLANTINGS <br />3.) MEDIUM WATER USE PLANTINGS <br />a IRRIGATION METHOD <br />OVERHEAD SPRAY <br />OR DRIP <br />b IRRIGATION EFFICIENCY <br />0.75 FOR SPRAY HEAD <br />0.81 FOR DRIP <br />c ETWU (ANNUAL GALLONS REQUIRED) = <br />ETo x 0.62 x ETAF x AREA <br />**WHERE 0.62 IS A CONVERSION <br />d <br />FACTOR THAT CONVERTS ACRE- <br />INCHES PER ACRE PER YEAR TO <br />GALLONS PER SQUARE FOOT PER <br />YEARS.** <br />MAWA (ANNUAL GALLONS ALLOWED) = (ETo) (0.62) [(ETAF X LA) + ((1-ETAF) x SLA)] <br />**WHERE 0.62 IS A CONVERSION FACTOR THAT CONVERTS ACRE- <br />e <br />INCHES PER ACRE PER YEAR TO GALLONS PER SQUARE FOOT PER <br />YEAR, LA IS THE TOTAL LANDSCAPE AREA IN SQUARE FEET, <br />AND ETAF IS .55 FOR RESIDENTIAL AREAS AND 0.45 FOR NON- <br />RESIDENTIAL AREAS.** <br />**AVERAGE ETAF FOR REGULAR LANDSCAPE AREAS MUST <br />BE 0.55 OR BELOW FOR RESIDENTIAL AREAS, AND 0.45 OR <br />BELOW FOR NON-RESIDENTIAL AREAS. <br />(B) <br />(A) <br />(B/A) <br />(B+D) <br />(A+C) <br />(B+D) / (A+C) <br />REGULAR LANDSCAPE AREA <br />TOTALS 2,898(A)(B) <br />0.81 <br />FACTOR (PF) <br />PLANT IRRIGATION <br />METHOD <br />ETAF <br />(PF / IE) <br />LANDSCAPE <br />AREA (SQ-FT)ETAF x AREA/ PLANTING DESCRIPTION <br />HYDROZONE #b <br />EFFICIENCY <br />(IE) <br />IRRIGATION <br />c <br />TOTAL WATER <br />USED <br />ESTIMATED <br />d <br />(ETWU) <br />REGULAR LANDSCAPE AREA <br />a <br />SPECIAL LANDSCAPE AREA <br />TOTALS <br />ETWU TOTAL <br />MAXIMUM ALLOWED WATER ALLOWANCE (MAWA)e <br />0(C)(D) <br />------------- <br />------------- <br />1.0 <br />1.0 <br />1.0 <br />----- <br />----- <br />----- <br />----- <br />----- <br />----- <br />123,182 <br />7 <br />4 <br />37,726 <br />201 <br />1150.5 <br />---------------------------- <br />CITY OF PLESANTON MAXIMUM APPLIED WATER ALLOWENCE <br />THE ETo REFERENCE FOR CITY OF PLESANTON IS (INCHES PER YEAR)46.2 <br />REFERENCE EVAPOTRANSPIRATION (ETo) 46.2 <br />---------- <br />"I AGREE TO COMPLY WITH THE REQUIREMENTS OF THE WATER <br />EFFICIENT LANDSCAPE ORDINANCE AND SUBMIT A COMPLETE <br />LANDSCAPE DOCUMENTATION PACKAGE" <br />NAME: <br />REGISTERED LANDSCAPE ARCHITECT # <br />DATE <br />02-11-2026 <br />0.2 1 29 <br />83,040 <br />DRIP 0.81 <br />0.81DRIP <br />0.5 <br />0.2 0.25DRIP0.81 <br />44 1,260 <br />478 13,692 <br />269 7,705 <br />0.81DRIP0.5 <br />0.81DRIP0.2 0.25 <br />345 9,882 <br />0.37 <br />7,819 <br />2,898 <br />0.81DRIP <br />268 <br />6 <br />7,677 <br />1720.62 <br />0.810.2 <br />0.2 <br />0.2 0.25DRIP0.81 <br />0.2 <br />0.62 <br />232 6,645DRIP0.81 <br />10 / LOW WATER USE PLANTINGS (GROUNDCOVER) <br />1 / MODERATE WATER USE PLANTINGS (TREE) <br />9 / LOW WATER USE PLANTINGS (GROUNDCOVER) <br />3 / MODERATE WATER USE PLANTINGS (TREE) <br />2 / LOW WATER USE PLANTINGS (SHRUB & GROUNDCOVER) <br />4 / MODERATE WATER USE PLANTINGS (TREE) <br />5 / LOW WATER USE PLANTINGS (SHRUB & GROUNDCOVER) <br />7 / LOW WATER USE PLANTINGS (TREE) <br />6 / LOW WATER USE PLANTINGS (SHRUB & GROUNDCOVER) <br />8 / LOW WATER USE PLANTINGS (SHRUB & GROUNDCOVER) <br />DRIP <br />DRIP 0.62 <br />0.25 <br />0.25 <br />0.25 <br />0.25 <br />1,245 35,662N/A 1.011 / HIGH WATER USE (POOL & SPA)N/A N/A <br />7,819 <br />1,381 <br />9 <br />1,911 <br />6 <br />1,071 <br />12 <br />1,075 <br />3 <br />929 <br />177 <br />1,245 <br />0.37 <br />7,819 <br />2,898 <br />MAINTENANCE TASK <br />CONTROLLER CABINET - OPEN CABINET AND CLEAN OUT DEBRIS <br />AND REPLACE BATTERY AS NECESSARY. CHECK WIRING AND <br />REPAIR AS NEEDED AND CHECK CLOCK AND RESET IF NECESSARY. <br />IRRIGATION SCHEDULE - ADJUST SCHEDULE FOR SEASONAL <br />VARIATIONS AND OTHER CONDITIONS WHICH MAY AFFECT THE <br />AMOUNT OF WATER NEEDED TO MAINTAIN PLAN HEALTH ADJUST <br />AS NECESSARY. <br />POC - VISUALLY INSPECT COMPONENTS FOR LEAKS, PRESURE <br />SETTINGS, SETTLEMENT OR OTHER DAMAGE AFFECTING THE <br />OPERATION OF A COMPONENT REPAIR AS NEEDED. <br />REMOTE CONTROL VALVES, ISOLATION VALVES AND QUICK <br />COUPLER VALVES VISUALLY INSPECT FOR LEAKS, SETTLEMENT, <br />WIRE CONNECTIONS AND PRESSURE SETTINGS. REPAIR OR ADJUST <br />AS NEEDED. <br />MAINLINE & LATERALS VISUALLY INSPECT FOR LEAKS OR <br />SETTLEMENT OF TRENCH. <br />SPRINKLERS VISUALLY CHECK FOR ANY BROKEN MISSIGNED OR <br />CLOGGED HEADS, HEADS WITH INCORRECT ARC, INADEQUATE <br />COVERAGE OR OVERSPRAY AND LOW HEAD DRAINAGE REPAIR <br />AS NEEDED. <br />FILTERS AND STRAINERS VISUALLY CHECK FOR LEAKS, BROKEN <br />FITTING CLEAN AND FLUSH SCREENS. <br />FREQUENT <br />QUARTERLY <br />MONTHLY <br />QUARTERLY <br />QUARTERLY <br />QUARTERLY <br />WEEKLY <br />MONTHLY <br />WATER AUDIT NOTE : <br />THE CONTRACTOR WILL CONDUCT AN IRRIGATION AUDIT USING A CERTIFIED IRRIGATION AUDITOR, <br />AFTER THE FINAL FIELD OBSERVATION HAS BEEN COMPLETED AND ALL IRRIGATION COMPONENTS ARE <br />INSTALLED IN ACCORDANCE WIT THE PLANS AND SPECIFICATIONS AND THE IRRIGATION SYSTEM IS <br />ACCEPTED BY THE PROJECT ARCHITECT FOR MAINTENANCE. <br />THE IRRIGATION AUDIT WILL BE CONDUCTED IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: <br />1.PLACE FLAGS AT EACH HEAD IN THE ZONE. <br />2.MEASURE SPACING AND MARK MID-POINTS BETWEEN HEADS. <br />3.PLACE WATER MEASURING RECEPTACLES. <br />4.TAKE READINGS OF WATER LEVEL IN RECEPTACLES AND RECORD RESULTS. <br />5.MEASURE HEAD PRESSURE IN EACH ZONE AND RECORD RESULTS. <br />6.AFTER COMPLETING ZONE ADVANCE TO NEXT ZONE AND REPEAT PROCEDURE. <br />7.SUBMIT THE RESULTS OF THE AUDIT TO THE PROJECT ARCHITECT. <br />THE IRRIGATION MAINTENANCE SCHEDULE TASKS LISTED BELOW ARE INTENDED AS MINIMUM <br />STANDARDS AND MORE FREQUENT ATTENTION MAY BE REQUIRED DEPENDING ON THE PARTICULAR <br />SITE CONDITIONS. <br />MAINTENANCE SCHEDULES : <br />A REGULAR MAINTENANCE SCHEDULE SATISFYING THE FOLLOWING CONDITIONS <br />SHALL BE SUBMITTED AS PART OF THE LANDSCAPE DOCUMENTATION PACKAGE. <br />LANDSCAPE SHALL BE MAINTAINED TO ENSURE WATER EFFICIENCY. A REGULAR <br />MAINTENANCE SCHEDULE SHALL INCLUDE, BUT NOT BE LIMITED TO, CHECKING, <br />ADJUSTING, AND REPAIRING IRRIGATION EQUIPMENT, RESETTING THE AUTOMATIC <br />CONTROLLER, AERATING AND DETHATCHING TURF AREAS, REPLENISHING MULCH, <br />FERTILIZING, PRUNING, AND WEEDING IN ALL LANDSCAPE AREAS. <br />WHENEVER POSSIBLE, REPAIR OF IRRIGATION EQUIPMENT SHALL BE DONE WITH THE <br />ORIGINALLY SPECIFIED MATERIALS OR THEIR EQUIVALENTS. <br />A LANDSCAPE IRRIGATION AUDIT SCHEDULE AS REQUIRED IN CHAPTER 20.09 OF TITLE <br />20 MAY BE RECOMMENDED. THE MAXIMUM PERIOD BETWEEN AUDITS SHALL BE FIVE <br />YEARS. <br />IRRIGATION AUDIT SCHEDULES : <br />NOTE: <br />"THE FLOW RATES FOR ALL PLUMBING FIXTURE SHALL COMPLY WITH MAXIMUM FLOW RATES <br />SPECIFIED IN SECTION 4.303.1" <br />"WHEN A SHOWER IS SERVED BY MORE THAN ONE SHOWERHEAD, THE COMBINED FLOW RATE OF <br />ALL THE SHOWER HEADS AND/OR OTHER OUTLETS CONTROLLED BY A SINGLE VALVE SHALL NOT <br />EXCEED 2.0 GALLONS PER MINUTE AT 80 PSI, OR THE SHOWER SHALL BE DESIGNED TO ONLY <br />ALLOW ONE SHOWERHEAD TO BE IN OPERATION AT A TIME." (4.303.1.3.2) <br />"FOR PROJECTS THAT INCLUDE LANDSCAPE WORK, THE LANDSCAPE CERTIFICATION, FORM GRN 12 <br />SHALL BE COMPLETED PRIOR TO FINAL INSPECTION APPROVAL." (STATE ASSEMBLY BILL NO. 1881) <br />FOR SITES WITH OVER 500 SF. OF LANDSCAPE AREA, WASTE PIPING SHALL BE ARRANGED TO <br />PERMIT DISCHARGE FROM THE CLOTHES WASHER, BATHTUB, SHOWERS, AND <br />BATHROOM/RESTROOMS WASH BASINS TO BE USED FOR A FUTURE GRAY WATER IRRIGATION <br />SYSTEM. (4.305.1) <br />"RECIRCULATING WATER SYSTEMS SHALL BE USED FOR WATER FEATURES" <br />"FOR SOILS LESS THAN 6% ORGANIC MATTER IN THE TOP 6" OF SOIL, COMPOST AT A RATE OF A <br />MINIMUM OF FOUR CUBIC YARDS PER 1,000 SQUARE FEET OF PERMEABLE AREA SHALL BE <br />INCORPORATED TO A DEPTH OF SIX INCHES INTO THE SOIL." <br />"AT THE TIME OF FINAL INSPECTION, THE PERMIT APPLICANT MUST PROVIDE THE OWNER OF THE <br />PROPERTY WITH CERTIFICATE OF COMPLETION, CERTIFICATE OF INSTALLATION, IRRIGATION <br />SCHEDULE OF LANDSCAPE AND IRRIGATION MAINTENANCE." <br />"UNLESS CONTRADICTED BY A SOIL TEST, COMPOST AT A RATE OF A MINIMUM OF FOUR CUBIC <br />YARDS PER 1,000 SQUARE FEET OF PERMEABLE AREA SHALL BE INCORPORATED TO A DEPTH OF <br />SIX INCHES INTO THE SOIL." <br />"FOR SOILS LESS THAN 6% ORGANIC MATTER IN THE TOP 6" OF SOIL, COMPOST AT A RATE OF A <br />MINIMUM OF FOUR CUBIC YARDS PER 1,000 SQUARE FEET OF PERMEABLE AREA SHALL BE <br />INCORPORATED TO A DEPTH OF SIX INCHES INTO THE SOIL." <br />"A DIAGRAM OF THE IRRIGATION PLAN SHOWING HYDROZONES SHALL BE KEPT WITH THE <br />IRRIGATION CONTROLLER FOR SUBSEQUENT MANAGEMENT PURPOSES." <br />"A CERTIFICATE OF COMPLETION SHALL BE FILLED OUT AND CERTIFIED BY EITHER THE SIGNER OF <br />THE LANDSCAPE PLANS, OR THE LICENSED LANDSCAPE CONTRACTOR FOR THE PROJECT." <br />"AN IRRIGATION AUDIT REPORT SHALL BE COMPLETED AT THE TIME OF FINAL INSPECTION." <br />"CHECK VALVES OR ANTI-DRAIN VALVES ARE REQUIRED ON ALL SPRINKLER HEADS WHERE LOW <br />POINT DRAINAGE COULD OCCUR.” <br />IRRIGATION AUDIT SCHEDULES : <br />LANDSCAPE IRRIGATION AUDIT SCHEDULES. A SCHEDULE OF LANDSCAPE IRRIGATION <br />AUDITS OF AT LEAST EVERY FIVE YEARS MUST BE ESTABLISHED, FOR ALL BUT <br />SINGLE-FAMILY RESIDENCES, AND OTHER PROJECTS WITH A LANDSCAPE AREA LESS <br />THAN 1 ACRE (0.405 HA). AS REQUIRED IN CHAPTER 20.09 OF TITLE 20 (UTILITIES CODES), <br />AN AUDIT SATISFYING THE FOLLOWING CONDITIONS SHALL BE SUBMITTED TO THE <br />COUNTY AS PART OF THE LANDSCAPE DOCUMENTATION PACKAGE. <br />AT A MINIMUM, AUDITS SHALL BE IN ACCORDANCE WITH THE LATEST STATE OF <br />CALIFORNIA LANDSCAPE WATER MANAGEMENT PROGRAM AS DESCRIBED IN THE <br />LANDSCAPE IRRIGATION AUDITOR HANDBOOK, PREPARED FOR THE CALIFORNIA <br />DEPARTMENT OF WATER RESOURCES, WATER CONSERVATION OFFICE, THE ENTIRE <br />DOCUMENT, WHICH IS HEREBY INCORPORATED BY REFERENCE. <br />THE SCHEDULE SHALL PROVIDE FOR LANDSCAPE IRRIGATION AUDITS TO BE <br />CONDUCTED BY A QUALIFIED INDIVIDUAL AS DETERMINED BY THE DIRECTOR AT LEAST <br />ONCE EVERY FIVE YEARS IN ACCORDANCE WITH THE REQUIREMENTS OF TITLE 20, <br />DIVISION 1 OF THE LOS ANGELES COUNTY CODE. <br />PA <br />T <br />E <br />L <br /> <br />R <br />E <br />S <br />I <br />D <br />E <br />N <br />C <br />E <br />ST <br />U <br />I <br />O <br /> <br />3 <br />1 <br />7 <br /> <br />D <br />E <br />S <br />I <br />G <br />N <br />S <br />LI-3 <br />6 <br />WA <br />T <br />E <br />R <br /> <br />E <br />F <br />F <br />I <br />C <br />I <br />E <br />N <br />T <br />LA <br />N <br />D <br />S <br />C <br />A <br />P <br />E <br /> <br />W <br />O <br />R <br />K <br />S <br />H <br />E <br />E <br />T <br />Page 303 of 373