My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL SPECIAL MEETING AGENDA PACKET 8-11-26
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
081126 SPECIAL
>
CITY COUNCIL SPECIAL MEETING AGENDA PACKET 8-11-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2026 9:09:20 AM
Creation date
8/7/2026 8:56:02 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/11/2026
DESTRUCT DATE
15Y
DOCUMENT NAME
SPECIAL MEETING AGENDA PACKET
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WH WH <br />24"TREE <br />10"TREE <br />9"CYP <br />9"CYP <br />9"CYP <br />9"CYP <br />9"CYP <br />9"CYP <br />9"CYP <br />9"CYP 9"CYP 9"CYP 9"CYP 9"CYP <br />9"CYP 9"CYP 8"CYP <br />8"CYP <br />14"RWD <br />47"RWD <br />28"22"R <br />W <br />D <br />11"CYP <br />11"CYP <br />11"CYP <br />11"CYP <br />11"CYP <br />11"CYP <br />11"CYP <br />11"CYP <br />11"CYP <br />45"RWD <br />74"RWD <br />40"RWD <br />49"RWD <br />6"STUM <br />P <br />33"TREE <br />PA <br />T <br />E <br />L <br /> <br />R <br />E <br />S <br />I <br />D <br />E <br />N <br />C <br />E <br />ST <br />U <br />I <br />O <br /> <br />3 <br />1 <br />7 <br /> <br />D <br />E <br />S <br />I <br />G <br />N <br />S <br />EX <br />I <br />S <br />T <br />I <br />N <br />G <br /> <br />T <br />R <br />E <br />E <br /> <br />P <br />L <br />A <br />N <br />LP-4 <br />13 <br />EXISTING TREE PLAN <br />NOTE: PLAN IS SHOWN DIAGRAMATICALLY. <br />0 8'16'24' <br />Scale: 3/32" = 1'-0" <br />NORTH <br />TREE PROTECTION NOTES: <br />EXPLORATORY EXCAVATION OF THE TRENCH AREA ANYWHERE NEAR THE DRIPLINE OF A TREE <br />USING AN AIR-SPADE IS RECOMMENDED. ONCE ROOTS ARE EXPOSED BY THIS METHOD, THEY MAY <br />BE EVALUATED BY AN ARBORIST. BY OBSERVING THE EXPOSED ROOTS, AN ACTION PLAN CAN BE <br />PREPARED, WHICH MAY INVOLVE THE SEVERING OF SOME ROOTS AND WHILE MAINTAINING <br />OTHERS. IF THE RECOMMENDED CONSTRUCTION GUIDELINES AND POST CONSTRUCTION <br />MONITORING AND CARE ARE <br />FOLLOWED, THE TREES SHOULD SUCCESSFULLY SURVIVE. ONLY TREES THAT HAVE A MODERATE <br />TO ELEVATED LIKELIHOOD OF IMPACT ARE CONSIDERED IN THIS SECTION: <br />TREES TO BE PRESERVED – ROOT LOSS MAY RESULT IN FLAGGING AND DESICCATED FOLIAGE. NO <br />STRUCTURAL INSTABILITY ANTICIPATED. <br />- ROOT PRUNING IS TO OCCUR NO CLOSER TO ANY TRUNK THAN THREE (3) TIMES THE <br />DIAMETER, DUE TO POTENTIAL FOR SUBSTANTIAL ROOT LOSS AND INSTABILITY IF ROOTS ARE <br />PRUNED ANY CLOSER. <br />- CROWN CLEAN AND CLEARANCE PRUNE CONSTRUCTION-SIDE OF CANOPY PRIOR TO <br />CONSTRUCTION ACTIVITIES; <br />- PRUNE ROOTS BY HAND; <br />- MULCH UNDER DRIPLINE TO A DEPTH OF SIX (6) INCHES MINIMUM AND MAINTAIN <br />MULCH THROUGHOUT CONSTRUCTION ACTIVITIES; <br />- SINGLE APPLICATION OF SLOW-RELEASE FERTILIZER AND PLANT GROWTH REGULATOR PRIOR <br />TO CONSTRUCTION ACTIVITIES; <br />- IRRIGATE MONTHLY DURING CONSTRUCTION ACTIVITIES WITH A FINAL IRRIGATION AT THE <br />COMPLETION OF THE PROJECT; <br />- MONITOR AND INSPECT MONTHLY DURING CONSTRUCTION ACTIVITIES WITH A FINAL <br />ASSESSMENT AT THE COMPLETION OF THE PROJECT. <br />THE FOLLOWING GUIDELINES MUST ALSO BE FOLLOWED: <br />•TO HELP COMPENSATE FOR ANY POTENTIAL ROOT LOSS, IT WILL BE ESSENTIAL TO <br />IRRIGATE ALL TREES DURING THE DRY MONTHS (ANY MONTH RECEIVING LESS THAN 1 INCH OF <br />RAINFALL) FOR A MINIMUM OF ONE (1) YEAR. IRRIGATE A MINIMUM OF TEN (10) GALLONS FOR EACH <br />INCH OF TRUNK DIAMETER EVERY TWO (2) WEEKS. A SOAKER HOSE OR A DRIP LINE IS PREFERRED <br />FOR THIS PURPOSE. THIS IRRIGATION MUST BE APPLIED DURING THE TREES’ RECOVERY PERIOD, <br />WHICH MAY BE LONGER THAN THE CONSTRUCTION PROCESS. <br />•IF ANY LARGE ROOTS (2 INCHES IN DIAMETER OR LARGER) ARE SEVERED, THE STUB <br />END(S) OF THE ROOT(S) MUST BE CLEANLY CUT USING A SHARP SAW AND SEALED USING A <br />PLASTIC BAG TIED ON THE END. PLASTIC BAGS MUST BE REMOVED AT THE TIME OF BACKFILL. <br />•MATERIALS MUST NOT BE STORED, STOCKPILED, DUMPED, OR BURIED INSIDE THE <br />DRIPLINE OF TREES. <br />•EXCAVATED SOIL MUST NOT BE PILED OR DUMPED, EVEN TEMPORARILY, INSIDE THE <br />DRIPLINES OF PROTECTED TREES. <br />•TREES TO BE PRESERVED MAY REQUIRE PRUNING TO CLEAR BRANCHES FROM <br />PROPOSED STRUCTURES, SCAFFOLDING, OR NECESSARY EQUIPMENT AND SHOULD BE <br />PERFORMED UNDER THE DIRECTION OF THE PROJECT ARBORIST. ANY PRUNING MUST BE <br />PERFORMED OR SUPERVISED BY AN ARBORIST CERTIFIED BY THE ISA (INTERNATIONAL SOCIETY <br />OF ARBORICULTURE) AND ACCORDING TO ISA, WESTERN CHAPTER STANDARDS, 1998. <br />•THE IRRIGATION MUST NOT BE DESIGNED TO STRIKE THE TRUNKS OF TREES, BECAUSE <br />OF POTENTIAL HIGH RISK OF DISEASE INFECTION. <br />Page 310 of 373
The URL can be used to link to this page
Your browser does not support the video tag.