Laserfiche WebLink
<br />231 Old Bernal Ave Page 7 PUD-152 <br />(Address this condition during construction) <br /> <br />15. EXCAVATION SAFETY: All excavations must be performed in conformance with <br />California Government Code Section 4216 et seq. No excavation shall occur until proper <br />notice is provided to Underground Service Alert (usanorth811.org) by calling either 811 or <br />800-642-2444 at least 72-hours prior to the work so buried utilities can be marked. All <br />excavations shall be covered or barricaded to prevent entry when work is inactive. Open <br />excavations in the public right-of-way must be covered by skid-resistant steel plates that are <br />firmly affixed to the surface with leading edges ramped. Excavations 5-feet and deeper require <br />a protective system as defined by Cal-OSHA. If a shoring system or trench boxes will be <br />utilized as the protective system, said system shall either be manufactured and installed <br />according to manufacturer recommendations, or designed by a registered professional engineer <br />and installed according to approved plans. No excavation shall be performed atop or adjacent <br />to a high-risk facility until authorized by the owner of the facility. High-risk facilities are <br />defined as gas transmission pipelines and hazardous liquid pipelines as regulated by the U.S. <br />Department of Transportation Pipeline and Hazardous Materials Safety Administration (US <br />DOT PHMSA) <br />(Address this condition during construction) <br /> <br />16. POLLUTANT REDUCTION IN STORMWATER: At no time during construction of the <br />project shall pollutants be allowed to enter, clog, or contaminate storm drain pipe networks or <br />open stormwater channels in violation of Pleasanton Municipal Code §9.14.080 et seq. The <br />applicant shall contain all trash and debris for proper disposal to authorized landfills or <br />recyclers. Erosion control features shall be deployed during the rainy season that extends from <br />October 1st to April 15th each year, or any time rain is forecast outside of this period. Best <br />Management Practices (BMPs) shall be strictly followed. Street sweepers must be employed <br />if soil or debris is tracked onto the public roads from vehicles exiting the site. Standard BMPs <br />are available from the California Stormwater Quality Association (CASQA), the United States <br />Environmental Protection Agency (EPA), Caltrans, and others. Notes and/or illustrations shall <br />be added to the plans that describe the BMPs to be utilized during construction. The use of <br />manufactured erosion control woven blankets and straw wattles that utilize plastic <br />monofilament netting is specifically prohibited. <br />(Address this condition during construction) <br /> <br />17. DUST CONTROL: Dust control measures must be employed during all phases of construction <br />to prevent airborne nuisance to neighboring properties. All stockpiles or unused materials that <br />can create dust shall be covered or removed. Exposed soil areas shall be routinely watered <br />until surfacing materials or landscaping is installed. Use of dust palliatives shall conform to <br />Caltrans Standard Specification Section 18. Any damage caused by airborne dust to <br />neighboring properties shall be cleaned with costs paid by the applicant. If the applicant fails <br />the address dust as directed by the City, the City shall have the right to enter the property to <br />effectuate the correction, with all costs paid by the applicant or levied as a lien against the <br />applicant’s property. <br />(Address this condition during construction) <br /> <br />Page 323 of 373