Laserfiche WebLink
Sam Oakley <br />231 Old Bernal Avenue Tree Inventory, Valuation, and Construction Guidelines <br />9/13/2024 6 <br /> <br /> <br />PO BOX 2412 <br />PISMO BEACH, CA 93448 <br /> <br /> (415) 407-6995 <br />SAM@OAKLEYGROUP.ORG <br />WWW.OAKLEYGROUP.ORG <br /> <br />• To help compensate for any potential root loss, it will be essential to irrigate all <br />trees during the dry months (any month receiving less than 1 inch of rainfall) for a <br />minimum of one (1) year. Irrigate a minimum of ten (10) gallons for each inch of <br />trunk diameter every two (2) weeks. A soaker hose or a drip line is preferred for <br />this purpose. This irrigation must be applied during the trees’ recovery period, <br />which may be longer than the construction process. <br /> <br />• If any large roots (2 inches in diameter or larger) are severed, the stub end(s) of the <br />root(s) must be cleanly cut using a sharp saw and sealed using a plastic bag tied on <br />the end. Plastic bags must be removed at the time of backfill. <br /> <br />• Materials must not be stored, stockpiled, dumped, or buried inside the dripline of <br />trees. <br /> <br />• Excavated soil must not be piled or dumped, even temporarily, inside the driplines <br />of protected trees. <br /> <br />• Trees to be preserved may require pruning to clear branches from proposed <br />structures, scaffolding, or necessary equipment and should be performed under the <br />direction of the Project Arborist. Any pruning must be performed or supervised by <br />an arborist certified by the ISA (International Society of Arboriculture) and <br />according to ISA, Western Chapter Standards, 1998. <br /> <br />• The irrigation must not be designed to strike the trunks of trees, because of <br />potential high risk of disease infection. <br /> <br />General Construction Guidelines <br /> <br />Any tree located within the footprint of the proposed structures will be removed prior to <br />construction. If construction will impact any other individuals located on this site, the <br />contractor shall abide by the general construction recommendations listed in the following <br />section of this report. The tree protection measures for establishing a Tree Protection Zone <br />(TPZ) are as follows. All work within the dripline or TPZ (whichever is greater) is to be <br />done by hand in the presence of the Project Arborist or designee. The TPZ is established <br />as follows: <br /> <br />• Tree Protection Fencing: The fence shall enclose the entire area under the canopy <br />dripline or TPZ (whichever is greater) of the tree(s) to be protected throughout the life of <br />the construction project. In some parking areas, if fencing is located on paving or concrete <br />that will not be demolished, then the posts may be supported by an appropriate grade level <br />concrete base, if approved. <br />Page 340 of 373