My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA PACKET (2)
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
111924 REGULAR
>
CITY COUNCIL REGULAR MEETING AGENDA PACKET (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2026 12:24:12 PM
Creation date
8/17/2026 12:24:09 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/19/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WATER SYSTEM MANAGEMENT PLAN OCTOBER 2024 / CAROLLO <br />CITY OF PLEASANTON WATER SYSTEM MANAGEMENT PLAN 6 <br />considering the tightening of the efficiency standards (ex. standard for CII landscapes with DIMs is <br />0.80 starting 2020, 0.63 starting 2035, and 0.45 starting 2040). It should be noted that the state’s <br />update of the water conservation regulations are ongoing, and the City will need to track progress <br />related to water conservation continually. The information documented in the WSMP may not be the <br />most current status of the state’s requirements. The Water Conservation Regulatory Review is <br />included as Appendix C <br />3.Condition Assessment Report: Carollo conducted field condition assessments of all of the City's <br />above ground water facilities over the course of multiple days. The results of the assessment were used <br />to develop a prioritized list of rehabilitation-based capital projects. Carollo also conducted a desktop <br />analysis of the distribution system pipelines and those results were used to develop the pipeline <br />rehabilitation recommendations. The highest priority projects were identified based on risk. The <br />Condition Assessment Report is included as Appendix D. <br />4.Operations, Maintenance, and Management of the Water Distribution System: Carollo conducted <br />an evaluation of the City’s Operations and Maintenance (O&M) practices and developed a list of <br />recommended O&M programs to implement. Recommendations include but are not limited to, <br />unidirectional flushing, water meter testing program, and others. The Operations, Maintenance, and <br />Management, of the Water Distribution System Technical Memorandum is included in Appendix E <br />5.SCADA Master Plan: West Yost (WY) completed a planning study focused on evaluating <br />improvements to the City's SCADA system including equipment, preventive maintenance, and cyber <br />security. The report documents multiple projects and programs to improve and harden the SCADA <br />system. The SCADA Master Plan also identified specific RTU upgrades. However, RTU upgrades are <br />assumed to be included in the pump station rehabilitation and replacement improvement projects and <br />thus is not specifically called out as a standalone project. If the City observes in the future that RTU <br />replacement needs occur faster than implementation of pump station CIP projects, the City may want <br />to consider implementing a dedicated project for RTU replacements. The SCADA Master Plan is <br />included as Appendix F. <br />6.Energy Master Plan: West Yost also completed an analysis looking at the Distributed Energy <br />Resources (DERs), microgrids, time-of-use management (TOU), as well as process control strategies to <br />evaluate energy optimization. The analysis looks at maximum allowable downtime (MAD) to evaluate <br />and develop mitigation measures related to system resilience. The Energy Master Plan is included as <br />Appendix G. <br />The findings from these evaluations were used to inform the capital and O&M program <br />recommendations. <br />Page 437 of 658
The URL can be used to link to this page
Your browser does not support the video tag.