My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA PACKET (2)
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
111924 REGULAR
>
CITY COUNCIL REGULAR MEETING AGENDA PACKET (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2026 12:24:12 PM
Creation date
8/17/2026 12:24:09 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/19/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WATER SYSTEM MANAGEMENT PLAN OCTOBER 2024 / CAROLLO <br />CITY OF PLEASANTON WATER SYSTEM MANAGEMENT PLAN 16 <br />Project Type Total Costs <br />($Millions) <br />RR-2 McCloud Tank/PS Decommission $ 1.24 <br />RR- 3 Foothill PS Rehab $ 1.32 <br />RR - 4 Tank Inspections $ 1.62 <br />RR- 5 Vineyard PS Rehab $ 2.13 <br />RR- 6 Kottinger PS Rehab $ 1.90 <br />RR- 7 Decommission of Grey Eagle PS $ 1.29 <br />Priority B Projects $ 15.75 <br />RR - 8 Customer Meter Replacement $ 9.30 <br />RR- 9 Laurel Creek PS Rehab $ 1.68 <br />RR - 10 Ruby Hill PS Rehab $ 2.04 <br />RR- 11 Decommission Well No. 7 $ 0.81 <br />RR- 12 Decommission Well 5 and 6 $ 0.71 <br />RR- 13 Decommission Well No. 8 $ 1.21 <br />Priority C Projects $ 22.80 <br />RR- 14 Other Facility Rehabilitation $ 22.80 <br />Rehabilitation and Replacement (Below Ground Facilities) $ 71.28 <br />Priority B Projects $ 31.68 <br />RR - 15 Pipeline Rehabilitation Backlog (4.8-miles/year) $ 31.68 <br />Priority C Projects $ 39.60 <br />RR - 16 Pipeline Rehabilitation (3-miles/year) $ 39.60 <br />Other Projects $ 6.73 <br />Priority A Projects $ 6.53 <br />SP - 1 Network Architecture (SCADA) $ 1.01 <br />SP - 2 Generator Projects5 $ 5.52 <br />Priority B Projects $ 0.20 <br />SP - 3 DER Projects (Tassajara and TO3) $ 0.20 <br />Project Total $ 262.10 <br />Notes: <br />(1)Projects are in 2024 dollars. <br />(2)Costs are total project delivery costs. Increase in City engineering staff to manage is not included. <br />(3)Project includes S-1, S-2, S-3, BS-1, I-2, and I-3 from Akel Report. Costs provided by City supersede Akel Report.""" <br />(4)City is considering one of two options: Project includes W-1, W-2, F-1, F-2, F-3, F-4, F-5 from Akel Report. Alternatively, <br />City is evaluating a Regional Groundwater Facility project with Zone 7 with related distribution changes. Costs provided by <br />City supersede the Akel report." <br />(5)Total costs for all generators including water, sewer, and storm is $9.39 million. "Costs show in this table is just for water". <br />Page 447 of 658
The URL can be used to link to this page
Your browser does not support the video tag.