My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA PACKET (2)
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
111924 REGULAR
>
CITY COUNCIL REGULAR MEETING AGENDA PACKET (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2026 12:24:12 PM
Creation date
8/17/2026 12:24:09 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/19/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WATER SYSTEM MANAGEMENT PLAN OCTOBER 2024 / CAROLLO <br />CITY OF PLEASANTON WATER SYSTEM MANAGEMENT PLAN 20 <br />Table 7 O&M Program <br />Project Type Cost <br />WQ – 1 Lead and Copper Rule Program Tracking $250,000 for initial implementation <br />WQ - 2 Cross Connection Control Plan $250,000 for initial implementation plan <br />WQ - 3 Nitrification Response Plan $50,000 <br />WC- 1 Water Meter Testing Program $100,000 for initial implementation followed by annual costs <br />of $10,000. <br />WC- 2 Water Conservation Program $250,000 for initial implementation <br />WC - 3 Water Loss $550,000 for initial leak detection program (pipe repairs <br />assumed to be included in CIP) <br />WC – 4 Systematic Data Handling Error Audit $50,000 <br />RR-17 Asset Management Program $250,000 for initial implementation followed by annual costs <br />of $10,000. <br />RR - 4 Tank Inspection Program Costs included in Long-Term CIP <br />RR - 18 Corrosion Protection $200,000 initial, then $10,000 annually <br />OM – 1 Unidirectional Flushing Program $75,000 for initial study, then followed by annual costs of <br />$50,000 (major valve replacements assumed to be included in <br />CIP) <br />OM – 2 Utility Training Program $50,000 annually <br />OM – 3 Water System Operations and Maintenance <br />Manual <br />$150,000 one-time <br />SP - 4 SCADA Standards Development: $169,000 <br />SP – 5 SCADA Preventive Maintenance Program $100,000 initial with 50,000 per year after <br />SP – 6 Backup Core Server Relocation $211,000 <br />SP – 7 Remote Access Improvements $371,000 <br />SP- 8 OT System Monitoring Implementation $850,000 <br />Full Time Employees $12.00 million over a 20-year period.(2) <br />Notes: <br />(1)Projects are in 2024 dollars. <br />(2)Five Operator FTEs to facilitate programs. <br />-2 FTEs starting in FY24/25 which has already been approved and included in baseline operating expenses (not included here). <br />-Additional 3 FTEs starting in FY 26/27 which is included in this line item. <br />Page 451 of 658
The URL can be used to link to this page
Your browser does not support the video tag.