My WebLink
|
Help
|
About
|
Sign Out
CORE & MAIN LP (#2027021)
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
C
>
CORE & MAIN LP (#2027021)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2026 3:47:47 PM
Creation date
8/21/2026 3:44:04 PM
Metadata
Fields
Template:
CONTRACTS
Description Type
Goods and Services
Contract Type
New
NAME
CORE & MAIN LP
Contract Record Series
704-05
Munis Contract #
2027021
Contract Expiration
6/30/2024
NOTES
WATER METER REPLACEMENT & AMI SYSTEM PROJECT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFP-2 – Scope of Work <br />RFP# PWD 25.604 City of Pleasanton, CA RFP-2 | Page 1 <br />Internal Use Only <br />APPENDIX A <br />City of Pleasanton <br />AMI System Implementation <br />Data Transfer Specifications <br />Scope of Work Addendum <br />RFP Reference:RFP #PWD-25.604 —CIP 26137 <br />Document Date:April 7, 2026 <br />Prepared By:Allen Hammond, IT Director, City of Pleasanton <br />Reference:CUS Exceptions Summary, Data Transfer Items (Exceptions 4–8) <br />Contractor:Core & Main LP / Concord Utility Services (CUS) <br />1. Purpose <br />This document establishes the data transfer specifications and technical requirements for the bidirectional <br />exchange of data between the City of Pleasanton ("City") and Core & Main LP / Concord Utility Services ("CUS") <br />during the AMI system deployment under RFP #PWD-25.604. These specifications supplement the contract <br />exceptions negotiated in the CUS Exceptions Summary (rows 34–38) and shall be incorporated into the final <br />Scope of Work. <br />The City's enterprise billing and customer information system is Tyler Munis. All data exchange processes <br />described herein must support integration with Tyler Munis as the system of record for customer accounts, <br />meter inventory, and billing data. <br />2. SFTP Infrastructure Requirements <br />Ref: CUS Exception 4 — SFTP file transfer is an adequate means of transferring data between parties. <br />2.1 Transport Security <br />•All SFTP connections shall use SSH protocol version 2 with a minimum key length of 2048-bit RSA or <br />equivalent (e.g., Ed25519). <br />•Key-based authentication is required. Password-only authentication is prohibited. <br />•TLS 1.2 or higher shall be enforced for all data in transit. <br />•CUS shall provide IP whitelisting capabilities to restrict SFTP access to City-authorized IP addresses. <br />2.2 Data at Rest <br />•All files residing on the SFTP server shall be encrypted at rest using AES-256 or equivalent. <br />Docusign Envelope ID: 6AD75F50-8A33-85A5-8039-9E3E1257A838Docusign Envelope ID: 177582DA-4F1C-8834-813C-BC4FD03AA45E
The URL can be used to link to this page
Your browser does not support the video tag.