My WebLink
|
Help
|
About
|
Sign Out
COUNCIL AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
050625 REGULAR
>
COUNCIL AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2026 4:21:10 PM
Creation date
8/26/2026 4:17:35 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/6/2025
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 3 <br />Environment, Strategy 1 – Implement the Four-Year Capital Improvement Program (CIP) to <br />complete the design and construction of budgeted capital projects, as well as advancing the <br />Citywide strategic goal of Safeguarding Our City: Public Safety and Emergency <br />Preparedness, Strategy 4 – Identify funding sources and implement the hazard mitigation plan <br />to address response to natural disasters. <br /> <br />FISCAL IMPACT <br />The recommended total for the not-to-exceed agreement with Wood Rodgers, Inc. is <br />$406,768, with the anticipated cost allocation of $271,179 from the Water CIP Replacement <br />Fund (Fund 421) and $135,589 from the Sewer CIP Replacement Fund (Fund 431). The sewer <br />portion of the work is currently funded (43141301-440108); CIP No. 21162). An appropriation <br />of $272,000 from the Water Replacement Fund (Fund 421) to the Emergency Power <br />Improvements Utility System, CIP No. 21162, will cover the water portion of the work. <br /> <br />Prepared by: Submitted by: Approved by: <br /> <br />Adam Nelkie, Assistant Dir. <br />of Public Works - <br />Engineering <br />Siew-Chin Yeong, Director of Public <br />Works <br /> <br />Gerry Beaudin, City <br />Manager <br /> <br />Attachments: <br />1. Professional Services Agreement with Wood Rodgers, Inc. <br /> <br />Page 137 of 249
The URL can be used to link to this page
Your browser does not support the video tag.