Laserfiche WebLink
Page 2 of 8 <br />continue to offer the discount program to qualified low-income customers with less than <br />30 CCF bi-monthly usage. <br /> <br /> <br />BACKGROUND <br />The City is a water retailer that operates and maintains a water distribution system to city <br />residences and businesses for domestic, irrigation, firefighting and other uses. Zone 7 Water <br />Agency (Zone 7) is the Tri-Valley’s water wholesaler that procures water from the California <br />Department of Water Resources (DWR) and produces water from its regional wells, which it <br />sells to the City and other Tri-Valley water retailers for distribution. Effective November 2022, <br />the City discontinued distributing water supplied from the City-owned groundwater wells due to <br />increasing per- and polyfluoroalkyl (PFAS) regulatory requirements. Since that time, the City <br />has been receiving 100 percent of its water supply from Zone 7. <br /> <br />In 2023, the City Council approved a two-year water rate increase (30 percent in 2024 and 12 <br />percent in 2025) to help maintain adequate funding for short-term operations and maintenance <br />of the water system and replenish the Water operations and maintenance (O&M) Fund 420 <br />reserves to City Council-approved levels. Subsequently, the City completed the Water System <br />Management Plan (WSMP), which identified a 20-year Capital Improvement Program (CIP) <br />and long-term operations and maintenance strategies. In January 2025, the City Council <br />approved the WSMP, which serves as the foundation for the financial planning component of <br />this rate study. <br /> <br />On March 4, 2025, the City Council approved the Water Enterprise Financial Plan (step one of <br />the water rate study process), including implementing the Enhanced project delivery model <br />from the WSMP, a revenue increase of 15 percent for the first two years and 8 percent for the <br />following two years, and issuing $35 million of debt to fund near-term capital improvements. <br /> <br />With the financial plan in place, staff developed step two of the rate study process, which <br />includes: <br />• Cost of service study that allocates the revenue requirements determined as part of the <br />previously completed financial analysis (step one) among different customer classes <br />• Rate design analysis that makes recommendations on rate structure that consider cost <br />of service and related policy and pricing objectives <br />• Estimation of the impact on the General Fund to maintain the City’s current discount <br />programs. <br /> <br />A separate rate study for the sewer enterprise is scheduled to begin in late 2025, following <br />completion of the Sewer System Management Plan (SSMP) and the Long-Term Sewer Capital <br />Improvement Plan (CIP). In the interim, staff will recommend adjusting sewer rates annually <br />based on the Consumer Price Index (CPI) until the study is complete as part of a future City <br />Council agenda item. <br /> <br />DISCUSSION <br />The objective of the cost of service study is to ensure revenue requirements are equitably <br />distributed to ratepayers commensurate with their service requirements. The cost of service <br />study was developed using the principles established by the American Water Works <br />Page 204 of 249