My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA PACKET 9-1-26
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
090126 REGULAR
>
CITY COUNCIL REGULAR MEETING AGENDA PACKET 9-1-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2026 2:46:40 PM
Creation date
8/27/2026 2:41:53 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/1/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br />Item #6 <br /> CITY COUNCIL AGENDA REPORT <br /> <br />September 1, 2026 <br />Public Works - Engineering Division <br /> <br />TITLE: ACCEPT PUBLIC IMPROVEMENTS PERFORMED BY INTEGRA <br />CONSTRUCTION SERVICES, INC., FOR THE DELUCCHI PARK MUSICAL <br />PLAZA, CIP NO. 26788 <br /> <br />SUMMARY <br />The Delucchi Park Musical Plaza, CIP No. 26788, included construction of the Don Lewis <br />Harmonic Symphony and associated plaza in Delucchi Park. Construction occurred in two <br />phases: the plaza was constructed in November 2025, followed by the installation of the <br />musical equipment and trees in May 2026. The project is now complete to the satisfaction of <br />the Director of Public Works, for a total project cost of $56,521. <br /> <br />BACKGROUND <br />On July 15, 2025, the City Council approved a funding appropriation of $60,000 for installation <br />of the Don Lewis Harmonic Symphony public art project at Delucchi Park. In September 2025, <br />the City solicited three informal bids from contractors with prior experience working for the City. <br />The City Manager administratively awarded a contract to Integra Construction Services, Inc., in <br />accordance with the City’s Purchasing and Procedures Policy, for $50,021, including a <br />construction contingency of $7,500. <br /> <br />DISCUSSION <br />The first phase of the project, construction of the concrete plaza and art pedestal, was <br />completed in November 2025 to allow the concrete to fully harden. In late January 2026, staff <br />approved a change order for $6,500 for the installation of two concrete trash pads and removal <br />and replacement of several irrigation valve boxes. The change order work, installation of the <br />musical play equipment, and the trees were completed in May 2026 in preparation for the <br />installation of the Don Lewis Harmonic Symphony sculpture. The sculpture arrived and was <br />installed on June 4, 2026. A dedication ceremony was held that same day. <br /> <br />EQUITY AND SUSTAINABILITY <br />Approval of this action advances the Climate Action Plan (CAP 2.0) in Transportation and <br />Land Use by providing greater park accessibility for all users. <br /> <br />OUTREACH <br />No outreach was conducted, as this item is a routine matter of City business. <br /> <br />FISCAL IMPACT <br />The total budget for the project was $70,461, consisting of $60,000 appropriated by the City <br />Council from the Public Facilities Impact Fee Fund (Fund 203) and $10,461 in Alameda <br />County park impact fees designated specifically for Lions Wayside and Delucchi Parks. The <br />total project cost for the Delucchi Park Musical Plaza project, CIP No. 26788, was $56,521, <br />Page 261 of 344
The URL can be used to link to this page
Your browser does not support the video tag.