Page 2 of 4 <br /> <br />DISCUSSION <br />Staff worked with Zone 7 to establish a draft term sheet based on the feasibility study to <br />develop the draft agreement (Attachment 2), with key terms summarized below. <br /> <br />Project Overview <br />The project includes construction of new groundwater production wells at Tennis Park and <br />Hansen Park, installation of raw groundwater pipelines connecting the wells to Zone 7's <br />Hopyard Chloramination Facility, and improvements to the Hopyard Chloramination Facility to <br />increase treatment capacity. <br /> <br />Zone 7 would operate the new groundwater supply facilities as part of its overall water supply <br />system and deliver the City’s GPQ through turnouts to the City distribution system. <br />Improvements to the City’s distribution system required to convey the GPQ under future <br />demand conditions are solely funded by the City, and are excluded from the proposed <br />agreement with Zone 7. <br /> <br />Design and Construction <br />The agreement designates Zone 7 as the lead agency for project delivery. As lead agency, <br />Zone 7 will be responsible for environmental review, permitting, procurement, design and <br />construction, and consultant and contractor administration. The project will use a Progressive <br />Design-Build (PDB) method, allowing the design team and contractor to collaborate during <br />design development and establish a Guaranteed Maximum Price prior to construction. <br /> <br />Although Zone 7 will administer the project, the agreement provides the City with meaningful <br />participation throughout design and construction. The City will lead community outreach, <br />review project deliverables, and provide input on design. Zone 7 retains final authority over <br />technical and operational decisions affecting the groundwater system to guarantee delivery of <br />3,500 acre-feet per year GPQ to Pleasanton. Zone 7 shall seek the City's approval on design <br />of project features affecting City-owned property, including facility aesthetics, location, and <br />noise. <br /> <br />The current estimated total capital cost for the project is $42.3 million in 2026 dollars. The <br />agreement establishes proportional cost sharing based on each agency's reserved production <br />capacity under average groundwater basin conditions. For the joint wells and raw groundwater <br />pipelines, the City's share is 36 percent, with Zone 7 funding the remaining 64 percent. For <br />improvements to the Hopyard Chloramination Facility, the City's share is 23 percent, with Zone <br />7 funding 77 percent. Each agency is responsible for its own self-performed costs. Zone 7 will <br />invoice the City quarterly for its share of eligible consultants and contractor costs, with <br />supporting documentation provided for each invoice. <br /> <br />Key Agreement Provisions <br />The agreement includes several provisions that protect the City's interests, including: <br />• The City shall be entitled to a minimum annual Groundwater Supply from the Project of <br />3,500 acre-feet per year (AFY), produced and delivered at a maximum daily volume of <br />6.2 million gallons per day (MGD). <br />• Either agency may discontinue participation in the project before construction begins <br />during the design phase by providing written notice. If either agency exercises this <br />Page 268 of 344