My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA PACKET 9-1-26
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
090126 REGULAR
>
CITY COUNCIL REGULAR MEETING AGENDA PACKET 9-1-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2026 2:46:40 PM
Creation date
8/27/2026 2:41:53 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/1/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ordinance No. 2308 August 11, 2026 <br />vehicular ingress and egress to and from the Project Site, as reflected in the <br />Project Approvals and DA Exhibit C. In addition, Applicant will undertake, through <br />construction or payment of a supplemental fair share payment, additional <br />improvements along and to Busch Road. <br />The Busch Road Improvements shall consist of: <br />Construction of Busch Road along the entirety of the Project frontage, as a <br />two-lane roadway with landscaped median, sidewalks, and buffered bike <br />lanes (with said improvement not being eligible for fee credit); <br />Installation of a 6 foot wide sidewalk, curb and gutter and roadway paving <br />on the north side of Busch Road, extending from the western edge of the <br />project site to the western boundary of the City Operations Services Facility <br />parcel; <br />Installation of a single-lane roundabout at the intersection of Busch Road <br />and Street B (with said improvement not being eligible for fee credit); and <br />Installation of a right turn lane on Busch Road, to the east of the <br />roundabout, to allow for vehicles accessing the PGS weigh station to queue <br />outside of the through travel lane (with said improvement not being eligible <br />for fee credit).Project Specific Condition <br />FIRE DEPARTMENT – 925-454-2361 <br />The Fire Prevention Bureau reviews building/civil drawings for conceptual on-site fire <br />mains and fire hydrant locations only. Plan check comments and approval DO NOT <br />include: 1.) Installation of the on-site fire mains and fire hydrants. Specific installation <br />drawings submitted by the licensed underground fire protection contractor shall be <br />submitted to the Fire Prevention Bureau for approval; and 2.) Backflow prevention or <br />connections to the public water mains. <br />121. FIRE HAZARDS: The Applicant shall keep the site free of fire hazards from the <br />start of lumber construction until the final inspection. <br />122. FIRE FLOW: Fire flow shall be in accordance with fire code appendix B table <br />B105.1(1). Note that fire flow for sprinklered one and two family dwellings up to <br />3600 square feet (including attached garages) is 500 gallons-per-minute. <br />123. FIRE CODE: All construction shall conform to the requirements of the 2025 <br />Pleasanton Fire Code and local ordinances. All required permits shall be <br />obtained prior to work commencement. <br />124. SITE SAFETY: Site safety during construction shall be in accordance with Fire <br />Code chapter 33. <br />125. FIRE SPRINKLERS: Automatic fire sprinklers shall be installed in all occupancies <br />in accordance with the 2025 Pleasanton Building, Fire and Residential Codes <br />Page 65 of 344
The URL can be used to link to this page
Your browser does not support the video tag.