My WebLink
|
Help
|
About
|
Sign Out
JOINT POWERS FINANCING AUTHORITY AGENDA PACKET 9-15-26
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
091526 JOINT POWERS
>
JOINT POWERS FINANCING AUTHORITY AGENDA PACKET 9-15-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2026 12:16:09 PM
Creation date
9/9/2026 12:15:06 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/15/2026
DESTRUCT DATE
15Y
DOCUMENT NAME
JOIN T POWERS FINANCING AUTHORITY AGENDA PACKET
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />24 <br />Potable Water Distribution System. The City’s distribution system currently consists of <br />approximately 330 miles of pipelines, 14 pump stations, and 21 water storage tanks. The City’s <br />distribution system has 16 different pressure zones. <br /> <br />Emergency Interties. The City currently has two existing pipeline interties with the Dublin <br />San Ramon Services District (“DSRSD”) and one pipeline intertie with the City of Livermore for <br />rapid emergency response. These interties are strictly for emergency conditions, such as a <br />major pipeline break, supply contamination, or interruption of deliveries due to earthquake, <br />flood, or other disasters. <br /> <br /> Recycled Water Facilities. The City does not own a wastewater treatment facility. The <br />majority of the City’s wastewater is treated by Dublin San Ramon Services District (DSRSD), <br />which owns and operates the Regional Water Treatment Facility, which also treats wastewater <br />from Dublin and the southern portion of San Ramon. The facility includes conventional <br />secondary treatment facilities, as well as tertiary recycled water treatment facilities. In addition, <br />wastewater produced from the southeastern portion of the City, referred to as Ruby Hill, is <br />treated by the City of Livermore, which also owns and operates a wastewater treatment facility <br />which produces tertiary treated recycled water. The City purchases recycled water from both <br />DSRSD and the City of Livermore; with the Livermore supplied recycled water restricted to <br />landscaping in the eastern portion of Pleasanton. <br /> <br />In 2016, the City completed its Recycled Water Project (the “RW Project”) to serve <br />landscapes irrigated with potable water, which included the construction of approximately <br />51,500 lineal feet (LF) of new recycled water pipeline, ranging in diameter from 6 inches to 20 <br />inches, and repurposing approximately 22,400 LF of existing potable pipeline into the recycled <br />water system. The RW Project was funded through a Clean Water State Revolving Fund <br />Program loan and Proposition 1 Program Grant Agreement with the State Water Resources <br />Control Board (SWRCB), with the goal of largely replacing existing potable irrigation demands <br />along the distribution system with recycled water; thereby reducing potable water demands. To <br />date the RW Project has reduced approximately 7percent of the City's annual potable demands <br />with recycled water. The City currently has a total of 98 permitted recycled water use sites, <br />consisting of 151 metered service connections serviced with recycled water. <br /> <br />Management <br /> <br />Brief biographies of key members of City staff involved in management of the Water <br />System are set forth below: <br /> <br />Public Works Director – Siew-Chin Yeong. Ms. Yeong has 26 years of experience in <br />civil engineering, capital project management, and development and oversight of capital <br />programs in both the private and public sectors. Prior to joining the City of Pleasanton, she <br />served as the Assistant Director of Public Works for the City of Oakland and in several positions <br />with the City and County of San Francisco, including as the Director of Capital Program and <br />Construction. During her tenure she was responsible for overseeing delivery of the City of <br />Oakland’s $455 million and San Francisco Municipal Transportation Agency’s $3.2 billion capital <br />improvement programs, managed construction of a $500 million annual paving program that <br />included replacing 13.6 miles of sewer systems, and development of storm water and facilities <br />master plans. Yeong also oversaw capital initiatives and the development of a maintenance <br />capital program for Bay Area Rapid Transit (BART). <br /> <br />Page 152 of 205
The URL can be used to link to this page
Your browser does not support the video tag.