Laserfiche WebLink
ARROYO LAGO RESIDENTIAL PROJECT <br /> ADDENDUM <br /> <br /> <br />92 FCS <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480036/Addendum/21480036 Arroyo Lago Residential Project Addendum.docx <br />yellow caution tape. The buffer zone shall be maintained around the active nest <br />site(s) until the young have fledged and are foraging independently. No <br />construction activities or construction foot traffic is allowed to occur within the <br />avoidance buffer(s). <br />4. The qualified Biologist shall monitor the active nest during construction activities <br />and modify the protection zone accordingly to prevent project-related nest <br />disturbance, until the young have fledged. <br />MM BIO-2a Avoidance and Minimization of Indirect Temporary Impacts to Water Quality <br />and Riparian Vegetation (Design Option B) <br />The project applicant shall obtain a Construction General Permit from the Regional <br />Water Quality Control Board (RWQCB) if Design Option B is selected. The applicant <br />shall ensure that the project Civil Engineer prepares all required stormwater planning <br />documents consistent with the requirements of the RWQCB (e.g., a Storm Water <br />Pollution Prevention Plan [SWPPP] that complies with current National Pollutant <br />Discharge Elimination System [NPDES]; Best Management Practices [BMPs] to <br />control the pollutants in stormwater runoff; and/or a Storm Water Management Plan <br />[SWMP]) shall be developed and integrated into the project plan. <br />MM BIO-2b Avoidance and Minimization of Indirect Permanent Impacts to Water Quality <br />and Riparian Vegetation (Design Option B) <br />Prior to construction the applicant shall install silt fencing including the placement of <br />straw wattles between all construction areas and the adjacent drainage swales to <br />avoid impacts to water quality by grading and construction if Design Option B is <br />selected. A qualified Biologist shall be on-site to monitor the installation of fencing. <br />Fencing shall be in place and regularly maintained during project implementation. <br />The project applicant shall install post-construction stormwater management <br />measures and establish a long-term maintenance plan. This requirement is intended <br />to ensure that the post-construction conditions at the Study Area do not cause or <br />contribute to direct or indirect water quality impacts (i.e., pollution and/or <br />hydromodification) upstream and downstream. Specifically, the discharger shall <br />demonstrate compliance with the post-construction standards set forth in the General <br />Permit. <br />Conclusion <br />There is no new information of substantial importance, changes in the project, or changes in <br />circumstances under which it will be undertaken, identifying new significant effects, nor is there a <br />substantial increase in the severity of previously identified significant impacts related to biological <br />resources. The conclusions from the Prior FEIR remain unchanged when considering the <br />implementation of the proposed project. No further environmental review is required.