My WebLink
|
Help
|
About
|
Sign Out
RES 2026066
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2026
>
RES 2026066
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2026 1:58:21 PM
Creation date
9/9/2026 1:36:27 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
9/1/2026
DESTRUCT DATE
15Y
DOCUMENT NO
2026-066
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARROYO LAGO RESIDENTIAL PROJECT <br /> ADDENDUM <br /> <br /> <br />174 FCS <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480036/Addendum/21480036 Arroyo Lago Residential Project Addendum.docx <br />Discussion <br />a) Conflict with Circulation System Plan, Ordinance, or Policy <br />Would the project: Conflict with a program plan, ordinance or policy of the circulation <br />system, including transit, roadway, bicycle and pedestrian facilities? <br />Prior FEIR Conclusions <br />The Prior FEIR found that the County Project would generate bicycle, pedestrian, and transit trips and <br />includes infrastructure to support these modes. The County Project proposes a sidewalk along Busch <br />Road connecting to Ironwood Drive, internal pedestrian pathways, and bicycle storage at a central <br />park. Although the project site is more than 0.5-mile walking distance from the nearest transit stop,54 <br />residents could access Wheels Route 10R and the Dublin/Pleasanton BART station via the Iron <br />Horse Regional Trail. These features align with ECAP Policy 189, which promotes transit, bicycle, and <br />pedestrian systems in major projects. Therefore, the County Project would not conflict with applicable <br />circulation system policies. The Prior FEIR concluded that impacts would be less than significant. <br />(Draft EIR, pp. 3.16-19, 6-20, 6-21). <br />Proposed Project Analysis and Conclusion <br />Consistent with the analysis in the Prior FEIR, the proposed project would generate bicycle, <br />pedestrian, and transit trips and includes infrastructure to support these modes of transportation. <br />Currently, there are no pedestrian or bicycle facilities that provide access to the project site. However, <br />a separate approved and entitled project (the Villages at the Quarry Project) is required to make <br />various roadway, bicycle, and pedestrian improvements to Busch Road, including bike lanes, <br />sidewalks, a Class IV multiuse path, a roundabout that provides access to both the Villages at the <br />Quarry Project and the proposed project’s entrances, and a dedicated queueing lane for the PGS, all <br />of which would be available for the benefit of the proposed project’s residents as well. If the Villages <br />at the Quarry Project does not proceed, the proposed project would be required to implement the <br />applicable Busch Road bicycle and pedestrian improvements to ensure adequate multimodal access <br />to the project site as addressed in the proposed project’s PADA, as described in Section 2.3.4, above. <br />The proposed project would include the construction of approximately 0.5 mile of multiuse trails on <br />the northern boundary of the project site and the western side of Street A in accordance with <br />applicable City standards, including the design guidelines outlined in the City’s Trails Master Plan. <br />The Trails Master Plan envisions a new Class I Trail along El Charro Road connecting Busch Road <br />and the existing Arroyo Mocho Trail to the north of the project site across the Chain of Lakes.55 <br /> <br />54 Although certain transit stops are located within approximately 0.5 mile of the project site when measured as a <br />straight-line (“as-the-crow-flies”) distance, the actual pedestrian travel distance exceeds 0.5 mile due to the absence of <br />direct walking routes and the need to follow the existing street and path network. <br />55 City of Pleasanton. 2019. Trails Master Plan. Website: https://www.cityofpleasantonca.gov/assets/our-government/public- <br />works/engineering/landscape-ordinance/trails/trails-master-plan.pdf. Accessed March 10, 2026.
The URL can be used to link to this page
Your browser does not support the video tag.