My WebLink
|
Help
|
About
|
Sign Out
RES 2026066
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2026
>
RES 2026066
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2026 1:58:21 PM
Creation date
9/9/2026 1:36:27 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
9/1/2026
DESTRUCT DATE
15Y
DOCUMENT NO
2026-066
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARROYO LAGO RESIDENTIAL PROJECT <br /> ADDENDUM <br /> <br /> <br />78 FCS <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480036/Addendum/21480036 Arroyo Lago Residential Project Addendum.docx <br />County Project. As such, the proposed project would result in similar impacts to construction-related <br />cancer risk, albeit slightly less given its reduced scope. Therefore, the proposed project would still be <br />required to implement MM AIR-3 to reduce this impact to less than significant levels. MM AIR-3 <br />requires all applicable construction equipment utilized in mass grading, paving, and building <br />construction phases to be Tier 4 or Tier 4 Equivalent. <br />The Prior FEIR determined that construction of the County Project would not exceed the Bay Area Air <br />District’s community health risk, DPM, or TAC emissions significance thresholds with implementation <br />of MM AIR-3. This includes thresholds for the first group of residents, who would be present during a <br />portion of the construction phase.23 In addition, the Prior FEIR determined that the operation of the <br />County Project would not generate sufficient vehicle traffic during project operation to substantiate <br />creating a CO hotspot, and thus, no significant operational impacts would occur. Because of the fact <br />that the proposed project would be substantially similar to the County Project, only with less <br />development, the proposed project’s operations would also not exceed the Bay Area Air District’s <br />significance thresholds for community health risk, DPM, or TAC, or generate sufficient vehicle traffic <br />during project operation to substantiate creating a CO hotspot. <br />With implementation of MM AIR-3 for construction-related impacts, the proposed project would not <br />result in any new or more severe significant impacts related to exposure of sensitive receptors to <br />substantial pollutant concentrations beyond what was analyzed in the Prior FEIR. Therefore, the <br />proposed project would not introduce new significant impacts or create substantially more severe <br />significant impacts than those previously identified in the Prior FEIR. No additional analysis is <br />required. <br />e) Odors <br />Would the project: Result in other emissions (such as those leading to odors) <br />adversely affecting a substantial number of people? <br />Prior FEIR Conclusions <br />Residential projects are not typically considered an operational source of odor; therefore, the Prior <br />FEIR focused its analysis of potential odor impacts on the County Project’s construction activities and <br />the proposed WWTP. <br />In terms of construction-related impacts, the Prior FEIR found that any construction-related odor <br />emissions would be temporary and intermittent. Additionally, noxious odors would be confined to the <br />immediate vicinity of the construction equipment. It was anticipated that by the time such emissions <br />reach any sensitive receptor sites, they would be diluted to well below any air quality or odor concern <br />level. Therefore, construction odor impacts would be less than significant. <br /> <br />23 The first production phase is expected to start in March 2028, with some residents moving into homes after the first <br />homes are constructed (June 2028). Construction is expected to continue until September 2030.
The URL can be used to link to this page
Your browser does not support the video tag.