My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA 9-15-26
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
091526 REGULAR
>
CITY COUNCIL REGULAR MEETING AGENDA 9-15-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2026 2:42:57 PM
Creation date
9/9/2026 2:40:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/15/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
325
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 3 <br />Item #15 <br /> CITY COUNCIL AGENDA REPORT <br /> <br />September 15, 2026 <br />Public Works - Utilities Division <br /> <br />TITLE: AUTHORIZE FUNDING FOR THE PRELIMINARY DESIGN AND OWNER'S <br />REPRESENTATIVE SERVICES FOR THE REGIONAL GROUNDWATER <br />DEVELOPMENT PROJECT WITH ZONE 7 <br /> <br />SUMMARY <br />On September 1, 2026, the City Council approved an agreement with Zone 7 Water Agency <br />(Zone 7) for the design, construction, and operation of a joint Regional Groundwater <br />Development Project. Under the agreement, Zone 7 will serve as the lead agency for Project <br />delivery, with a target operational date of December 2029. The Project will be delivered using <br />the Progressive Design Build (PDB) method, which allows the design team and contractor to <br />collaborate during design development and establish a guaranteed maximum price before <br />construction. <br /> <br />Zone 7 has selected Luhdorff & Scalmanini, Consulting Engineers (LSCE) for preliminary <br />design and owner's representative services to support procurement of a PDB contractor for a <br />cost not to exceed $2.25 million,The City’s share of these services is $810,000 and requires <br />funding authorization by Council per the Zone 7 and City agreement. <br /> <br />BACKGROUND <br />Historically, approximately 20 to 25 percent of Pleasanton's water was provided by <br />groundwater wells. However, in 2022, the City took these wells offline after detecting PFAS. <br /> In 2024, the City Council approved an agreement with Zone 7 to evaluate the feasibility of a <br />Joint Groundwater Wells Project. The feasibility study (Phase I) was completed in 2025 and <br />identified Pleasanton Tennis and Community Park and Hansen Park as feasible locations for <br />new groundwater wells. On April 21, 2026, the City Council directed staff to proceed with a <br />joint project with Zone 7, and draft an agreement for Phase II (Design and Construction), and <br />Phase III (Operations) of the new facilities. On September 1, 2026, the City Council approved <br />an agreement with Zone 7 Water Agency (Zone 7) for the design, construction, and operation <br />of a joint Regional Groundwater Development Project. The agreement establishes cost- <br />sharing terms under which the City will fund 36 percent of the wells and raw groundwater <br />pipelines and 23 percent of the Hopyard Chloramination Facility upgrades. Zone 7 will fund the <br />remaining costs. <br /> <br />On August 19, 2026, the Zone 7 Board of Directors authorized its General Manager to <br />negotiate, execute a contract with Luhdorff & Scalmanini, Consulting Engineers (LSCE), not to <br />exceed $2.25 million, for preliminary design and owner's representative services to support <br />procurement of a Progressive Design Build (PDB) contractor. The City’s share of these <br />services is $810,000 and requires funding authorization by Council per the Zone 7 and City <br />agreement. <br /> <br />The City’s estimated Project cost is $29.0 million, including City-funded distribution system <br />Page 128 of 318
The URL can be used to link to this page
Your browser does not support the video tag.