My WebLink
|
Help
|
About
|
Sign Out
Planning Commission Agenda Packet 09092026
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2026
>
09-09
>
Planning Commission Agenda Packet 09092026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2026 12:59:11 PM
Creation date
9/10/2026 12:50:56 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/9/2026
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Additional Housing Opportunity Zone Sites CEQA Guidelines Sections 15164: Addendum to a <br />Certified EIR <br />CEQA Guidelines Section 15164 Addendum <br /> <br /> <br /> 25 <br />SECTION 3: CEQA GUIDELINES SECTION 15164: ADDENDUM TO <br />A CERTIFIED EIR <br />Section 15164 of the State CEQA Guidelines states that an Addendum to an <br />EIR shall be prepared “if some changes or additions are necessary, but none <br />of the conditions described in Section 15162 calling for preparation of a <br />subsequent EIR have occurred.” Thus, if none of the conditions described <br />below are met, the City shall prepare an Addendum to a previously certified <br />EIR or ND if some changes or additions are necessary but none of the <br />conditions described in CEQA Guidelines Section 15162 calling for <br />preparation of a subsequent EIR or ND have occurred (CEQA Guidelines § <br />15164, subd. (a)). <br />An Addendum need not be circulated for public review but can be included <br />in or attached to the Final EIR or ND (CEQA Guidelines § 15164, subd. (c)). <br />The decision-making body shall consider the Addendum to the Prior FEIR prior <br />to making a decision on the proposed project (CEQA Guidelines § 15164, <br />subd. (d)). An agency must also include a brief explanation of the decision <br />not to prepare a subsequent EIR or ND pursuant to Section 15162 (CEQA <br />Guidelines § 15164, subd. (e)). <br />Consequently, once an EIR or ND has been certified for a project, no <br />subsequent EIR or ND is required under CEQA unless, based on substantial <br />evidence: <br />(1) Substantial changes are proposed in the project which will require <br />major revisions of the Prior FEIR due to the involvement of new <br />significant environmental effects or a substantial increase in the <br />severity of previously identified significant effects; <br />(2) Substantial changes occur with respect to the circumstances under <br />which the project is undertaken which will require major revisions of <br />the Prior FEIR due to the involvement of new significant environmental <br />effects or a substantial increase in the severity of previously identified <br />significant effects; or <br />(3) New information of substantial importance, which was not known and <br />could not have been known with the exercise of reasonable diligence <br />at the time the Prior FEIR was certified as complete, shows any of the <br />following:
The URL can be used to link to this page
Your browser does not support the video tag.