My WebLink
|
Help
|
About
|
Sign Out
Planning Commission Agenda Packet 09092026
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2026
>
09-09
>
Planning Commission Agenda Packet 09092026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2026 12:59:11 PM
Creation date
9/10/2026 12:50:56 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/9/2026
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Additional Housing Sites Rezonings Project <br />Addendum CEQA Guidelines Section 15164 Addendum <br /> <br /> <br />34 <br />building and adjoining landscape, and consistency with such regulations <br />would be subject to City review. Additionally, development on the proposed <br />sites would be subject to the applicable requirements set forth by the <br />California Energy Code (Title 24, Part 6 CCR). Compliance with the <br />applicable lighting and energy requirements established by the California <br />Energy Code and Municipal Code would ensure that light and glare <br />associated with future development would not spill over onto adjacent land <br />uses. Therefore, impacts would be less than significant, and the proposed <br />project would not result in a new or more severe adverse impact that was <br />not previously identified and disclosed in the Prior FEIR. No further analysis is <br />required. <br />Conclusion <br />With regards to Aesthetics, the Addendum demonstrates that: <br />1. No new or more severe impacts related to the proposed project or its <br />sites have been identified. <br />2. There are no new circumstances involving new or more severe impacts <br />which were not discussed by the Prior FEIR. <br />3. No new information requiring new analysis or verification has been <br />identified which results in an impact which is more severe than <br />anticipated by the Prior FEIR. <br />4. No mitigation measures are necessary because the proposed project’s <br />specific impacts would be less than significant. <br /> <br />Mitigation Measures <br />None.
The URL can be used to link to this page
Your browser does not support the video tag.