My WebLink
|
Help
|
About
|
Sign Out
Planning Commission Agenda Packet 09092026
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2026
>
09-09
>
Planning Commission Agenda Packet 09092026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2026 12:59:11 PM
Creation date
9/10/2026 12:50:56 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/9/2026
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Additional Housing Sites Rezonings Project <br />CEQA Guidelines Section 15164 Addendum Addendum <br /> <br /> <br /> 59 <br />Environmental Issue <br />Area <br />Prior FEIR <br />Determination <br />New or More <br />Severe <br />Impacts? <br />New <br />Circumstances <br />Involving New <br />or More Severe <br />Impacts? <br />New <br />Information <br />Requiring New <br />Analysis or <br />Verification? <br />Applicable <br />Mitigation <br />Measures <br />evidence, to be <br />significant <br />pursuant to criteria <br />set forth in <br />subdivision (c) of <br />Public Resources <br />Code Section <br />5024.1. <br /> <br />a) Historical Resources <br />Would the project: Cause a substantial adverse change in the significance of a <br />historical resource pursuant to Section 15064.5? <br />Summary of Prior FEIR <br />The Prior FEIR concluded that although construction activities associated with <br />General Plan buildout could potentially affect known historic or cultural <br />resources, federal, State, and local laws, as well as the goals, policies, and <br />programs included in the General Plan, would reduce any potential impacts <br />to such resources to a less than significant level. <br />Proposed Project Analysis and Conclusion <br />The proposed sites are located within similar urban/developed areas <br />compared to those evaluated in the Prior FEIR. These areas may contain <br />potentially historic resources that may be impacted by development <br />consistent with the proposed project. Consistent with the Prior FEIR, the <br />potential to impact historical resources over 45 years in age at the time an <br />application is deemed complete would be required to undergo project- <br />specific environmental review in compliance with CEQA Guidelines Section <br />15064.5 to determine whether the building or structure may be a historic <br />resource, and take appropriate action, such as requiring additional site- <br />specific or project-specific measures to reduce any potential impacts. The <br />Prior FEIR concluded that future development within the proposed sites would <br />be required to comply with adopted State, federal, and local laws to protect <br />historical resources. Implementation of General Plan programs and policies, <br />such as Program 5.1 to 5.3 and Policy 1, Municipal Code Section 18.140.030, <br />and project-specific environmental review would ensure that impacts to <br />historical resources would be less than significant. Therefore, the proposed
The URL can be used to link to this page
Your browser does not support the video tag.