My WebLink
|
Help
|
About
|
Sign Out
PACIFIC GAS AND ELECTRIC - ACTUAL COST CONTRACT
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
P
>
PACIFIC GAS AND ELECTRIC - ACTUAL COST CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2026 11:19:28 AM
Creation date
9/17/2026 11:18:09 AM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
4/7/2003
LONG TERM AGREEMENTS - NAME
PACIFIC GAS AND ELECTRICTITY
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
LONG TERM AGREEMENTS - NOTES
ACTUAL COST CONTRACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. City shall acquire, at no cost to PG&E and in a form satisfactory to PG&E, <br /> all necessary permits required for the temporary or permanent rearrangement of <br /> PG&E's facilities from governmental agencies having jurisdiction over the same and <br /> shall file any statement required by, and otherwise comply with, the applicable <br /> provisions of the Environmental Quality Act of 1970 (California Public Resources <br /> Code, Sections 21000 et seq.). <br /> 3. City shall convey or caused to be conveyed to PG&E all necessary land or <br /> land rights in a form satisfactory to PG&E to permit PG&E to install its facilities in <br /> a new location. <br /> 4. In the event the construction of temporary facilities is necessary, PG&E <br /> may use lands owned or controlled by the City for the purpose of making such <br /> temporary installation provided that City shall have approved the location thereof. <br /> Upon completion of construction of such facilities in their permanent location, <br /> PG&E shall remove all temporary facilities. <br /> 5. Upon the completion of the work, City will reimburse PG&E for 100% of the <br /> actual net cost which PG&E has incurred in effecting the improvements of its <br /> facilities including costs, if any, involved in any temporary rearrangement. The <br /> actual net cost is presently estimated to be $55,000.00. <br /> 6. Actual cost will be determined in accordance with the uniform system of <br /> accounts prescribed for utility companies by the Public Utilities Commission of the <br /> State of California or PG&E's regularly established accounting practices and will <br /> include, but will not be limited to, the following charges: Survey costs, acquisition of <br /> land rights, labor and payroll taxes, materials and supplies, transportation, stores <br /> and tool expense, supervision and overheads, including allowance for funds used <br /> during construction, and an allowance for workmen's compensation and public <br /> liability and property damage insurance, and estimated federal and state taxes. <br /> 7. Actual net cost shall be actual cost reduced by the following: <br /> (a) Betterments defined as replacements costing more than the replaced <br /> facilities because of greater capacity, durability or efficiency. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.