My WebLink
|
Help
|
About
|
Sign Out
PACIFIC GAS AND ELECTRIC - ACTUAL COST CONTRACT
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
P
>
PACIFIC GAS AND ELECTRIC - ACTUAL COST CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2026 11:19:28 AM
Creation date
9/17/2026 11:18:09 AM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
4/7/2003
LONG TERM AGREEMENTS - NAME
PACIFIC GAS AND ELECTRICTITY
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
LONG TERM AGREEMENTS - NOTES
ACTUAL COST CONTRACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
^► An%. <br /> Actual Cost Contract with The City of Pleasanton <br /> PG&E Administration Information Block: <br /> Area 2 <br /> Mission Division <br /> Pleasant Hill Land Services <br /> Electric Transmission <br /> T. 3S. R. 2E. Section 17 N1/2 of NW1/4 MDB&M <br /> FERC: N.A. <br /> PG&E Drawing No: 202101 Sheet 4 of 7 Sheets <br /> Existing LD: 2203-01-0094. <br /> Cross-Referenced LD: 2203-01-0747 <br /> Interest: #3,#42 <br /> SBE: N.A. <br /> ORDER#30275708 <br /> JCN: N.A. <br /> County: Alameda <br /> Utility Notice Numbers: N.A. <br /> Prepared By: ARS4 <br /> Checked By: RMBF <br />
The URL can be used to link to this page
Your browser does not support the video tag.