My WebLink
|
Help
|
About
|
Sign Out
ORD 2308
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2301 - 2400
>
ORD 2308
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2026 11:04:41 AM
Creation date
9/18/2026 10:54:45 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
9/1/2026
DESTRUCT DATE
PERMANENT
DOCUMENT NO
2308
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ordinance No. 2308 August 11, 2026 <br />conformance with the Project Plans and included in the building permit submittal. <br />Any proposed modifications shall be subject to review and approval by the <br />Planning Division prior to issuance of building permits. <br /> <br />18. SIGNAGE: The construction plans submitted for issuance of a building permit <br />shall include design details of any site monument sign(s). Any site wayfinding <br />shall be designed in compliance with Section 18.96.040. of the Pleasanton <br />Municipal Code, unless otherwise approved by the Director of Community and <br />Ecomonic Development. Said sign designs are subject to review and approval by <br />the Director of Community and Economic Development prior to issuance of a <br />building permit. Project Specific Condition <br /> <br />19. FENCE/WALL: All fencing and walls shall be in compliance with the Project plans <br />and shall be shown on the construction plans with the building permit submittal. <br />The design and location must be approved by the Planning Division and comply <br />with all applicable setback requirements. <br /> <br />20. MOCK-UP: The Applicant shall set up a large material and color mock-up <br />(36’x48”) on site to confirm conformance with the Approved Plans prior to <br />issuance of the grading permit and shall be subject to the review and approval of <br />the Planning Division. <br /> <br />21. LIGHTING AND PHOTOMETRICS PLAN: The Applicant shall submit a lighting <br />and photometrics plan with the building permit submittal. The plan shall include <br />photometric contours, manufacturer’s specifications on the fixtures, and mounting <br />heights. All exterior lighting including landscape lighting shall be directed <br />downward and designed or shielded so as to not shine onto neighboring <br />properties or streets. The photometrics shall be reviewed and approved by the <br />City Traffic Engineer and Director of Community and Economic Development <br />prior to building permit issuance. The type and location of all exterior light fixtures <br />shall be reviewed and approved by the Director of Community and Economic <br />Development prior to building permit issuance. <br /> <br />22. FINAL INSPECTION: Final inspection of each residence by the Planning Division <br />is required prior to occupancy. <br /> <br />23. TRANSFORMERS: New electrical transformers shall be either (a) placed <br />underground, or (b) placed above ground and screened from view. Details of the <br />new electrical transformers, and any screening for aboveground transformers <br />shall be architecturally compatible with the building, shall be included in the <br />building permit submittal, and shall be subject to the review and approval of the <br />Director of Engineering/City Engineer and Director of Community and Economic <br />Development prior to issuance of the relevant building permit. <br /> <br />24. MECHANICAL EQUIPMENT – SCREENING: The Applicant shall effectively and <br />feasibly screen from public view all ducts, meters, air conditioning equipment,
The URL can be used to link to this page
Your browser does not support the video tag.