My WebLink
|
Help
|
About
|
Sign Out
ORD 2308
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2301 - 2400
>
ORD 2308
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2026 11:04:41 AM
Creation date
9/18/2026 10:54:45 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
9/1/2026
DESTRUCT DATE
PERMANENT
DOCUMENT NO
2308
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ordinance No. 2308 August 11, 2026 <br />sleeping quarters for a security guard subject to receipt of a temporary <br />conditional use permit (per PMC 18.116.010.E). <br /> <br />30. CONSTRUCTION TRAILERS: A construction trailer shall be allowed to be <br />placed on the Project site for daily administration/coordination purposes during <br />the construction period. <br /> <br />31. CONSTRUCTION PARKING MANAGEMENT PLAN: The Applicant shall prepare <br />a construction parking management plan to address construction parking <br />demands during the construction phase of the Project. The construction parking <br />management plan shall be subject to the review and approval by the City Traffic <br />Engineer and Director of Community and Economic Development prior to <br />issuance of a grading permit or the first building permit, whichever comes first. <br />The following items shall be incorporated into the construction and parking <br />management plan: <br /> <br />a. Show truck route for construction and delivery trucks that does not <br />include neighborhood residential streets, unless approved by the City <br />Traffic Engineer. <br />b. Show construction vehicles and equipment parking area, materials <br />storage, temporary fencing, construction trailer location, and <br />construction contractors/workers parking area. <br />c. Sidewalk closure or narrowing is not allowed during on-site <br />construction activities without prior approval by the City. <br /> <br />For purposes of this COA, Santa Rita Road, Busch Road, Stanley Boulevard, <br />Valley Avenue and Boulder Street extension through Villages at the Quarry <br />project shall not be considered “neighborhood residential streets.” <br /> <br />32. NOTICE OF CONSTRUCTION: Prior to construction, the Applicant shall notify <br />the owners and occupants within the Ironwood Community, i.e. the Village at <br />Ironwood, Meridian at Ironwood, Ponderosa Homes, and Ponderosa Apartments, <br />Villages at the Quarry (located at 3300 Busch Road), and Pleasanton Garbage <br />Services (located at 3310 Busch Road) of the construction schedule in writing. <br />Such notice shall include contact names and numbers for the Applicant and <br />contractor. Project Specific Condition. <br /> <br />33. DISTURBANCE COORDINATOR: Prior to the issuance of a grading permit, the <br />Applicant shall designate a “disturbance coordinator” who shall be responsible for <br />responding to any complaints regarding construction noise, dust, construction <br />parking, etc. The coordinator (who may be an employee of the general <br />contractor) shall determine the cause of the complaint and shall require the <br />implementation of measures warranted to correct the problem. A telephone <br />number of the disturbance coordinator shall be posted on the construction site <br />fence and on the notification sent to neighbors adjacent to the Project site. The
The URL can be used to link to this page
Your browser does not support the video tag.