Laserfiche WebLink
Ordinance No. 2308 August 11, 2026 <br />66. SUBDIVISION IMPROVEMENT AGREEMENT: Subdivision improvements <br />required as part of the subdivision, both onsite and offsite, must be either <br />completed to the satisfaction of the City Engineer prior to map approval, or <br />guaranteed by a Subdivision Agreement. The agreement requires the Applicant <br />to post financial security in the form of either a cash deposit, letter of credit, or <br />surety bonds in amounts equivalent to the value of the public improvements. If <br />surety bonds are utilized, the form of the bond language shall be consistent with <br />California Government Code §66499.1 for faithful performance and §66499.2 for <br />labor and materials. The amounts of the bonds shall be 100% of the total <br />estimated value of required subdivision improvements consistent with §66499.3. <br />In addition, the City requires a warranty bond (often referred to as a maintenance <br />bond) for 10% of the estimated value. The warranty bond shall be active for 1 <br />year following formal acceptance of the improvements. All submitted securities <br />are subject to review and approval by the City Attorney. In addition, final maps <br />and the associated Subdivision Agreement are subject to approval by the City <br />Council. (Fulfill this condition prior to map approval.) <br /> <br />67. CITY SURVEYOR: The City utilizes the services of an outside consultant to <br />certify the technical accuracy of subdivision maps as City Land Surveyor <br />pursuant to California Government Code §66451.1. In order to provide this <br />service, the consultant will submit a proposal to the City for the estimated cost of <br />the work. The estimate will be presented to the Applicant together with the City’s <br />administrative markup according to the City’s adopted Master Fee Schedule. <br />Review of the subdivision map cannot commence until the Applicant has <br />submitted payment to the City for these costs. If the ultimate fee at the <br />conclusion of the work is less than this payment, the Applicant will be refunded <br />the difference. If the ultimate fee is more than this payment, then the Applicant <br />shall submit payment for the difference before the consultant certifies the map. <br /> <br />The following statement shall be included on the cover sheet of the map: “I, <br />[NAME PROVIDED BY CITY], P.L.S, Acting City Surveyor for the City of <br />Pleasanton, Alameda County, California, do hereby state that I have examined <br />this map entitled “[MAP NAME/NUMBER]”, and I am satisfied that said map is <br />technically correct. [SIGNATURE LINE], [DATE], [SPACE FOR STAMP]” <br />(Address this condition prior to map approval.) <br /> <br />68. DEDICATIONS TO THE CITY: Dedications to the City shall conform to the <br />following standards whether dedicated on a subdivision map or by recorded <br />separate instrument: (Fulfill this condition prior to recordation of map or separate <br />instrument title documents granting rights to the City.) <br /> <br />For final maps, right-of-way dedications for roadways or similar access shall be <br />offered irrevocably to the City in fee for public purposes pursuant to California <br />Government Code Section 66439(d)(3) including the right to install and operate <br />public utilities. Right-of-way is defined in Pleasanton Municipal Code §13.04.010 <br />