My WebLink
|
Help
|
About
|
Sign Out
ORD 2308
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2301 - 2400
>
ORD 2308
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2026 11:04:41 AM
Creation date
9/18/2026 10:54:45 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
9/1/2026
DESTRUCT DATE
PERMANENT
DOCUMENT NO
2308
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ordinance No. 2308 August 11, 2026 <br />storm runoff to the nearest public street or open flood control facility in the event <br />on-site pipes become plugged. The flow path shall be lower than the finish floor <br />elevation of all habitable structures. The flow path cannot rely on neighboring <br />properties unless a storm drain easement across the neighbor is obtained. <br />Sump properties must be designed to discharge the 50-year recurrence interval <br />storm event through the pipe network before habitable structures become <br />inundated. (Fulfill this condition prior to plan approval.) <br /> <br />73. STORM DRAIN FORCE MAIN: The SDFM intended to discharge stormwater <br />from the detention basin to the City pipe network on Busch Road is shown <br />extending across property owned by Amazon (APN 946-1250-19-6). The <br />Applicant shall provide evidence of property rights acquired from Amazon for this <br />private pipeline. Alternatively, the Applicant shall relocate the pipeline onto <br />property where easement rights can be obtained. (Fulfill this condition prior to <br />plan approval.) <br /> <br />74. STORM DRAIN PUMP EQUIPMENT: The planned bioretention area and <br />detention basin to be located east of the current El Charro Road alignment will be <br />served by pumping equipment. Said equipment could be damaged if the controls <br />become inundated. Because this area is identified as Zone A on FEMA Flood <br />Insurance Rate Maps and is thus subject to floodwaters, any pump equipment <br />associated with the storm drain network shall be elevated at least one foot above <br />the expected flood elevation. (Fulfill this condition prior to plan approval.) <br /> <br />75. STORM DRAIN BEYOND SUBDIVISION BOUNDARY: The Applicant shall grant a <br />storm drain easement (SDE) to the City for any portion of the storm drain network <br />that extends beyond the subdivision boundary including the pipe network, <br />bioretention area, detention basin, pump system, and force main to the east. <br />Maintenance of these improvements shall be by the City with funding from the <br />Community Facilities District except as follows: Any weed abatement or <br />ornamental landscaping maintenance within the bioretention or <br />surrounding/appurtenant areas shall be the responsibility of a private entity such <br />as the homeowner’s association or underlying property owner. (Fulfill this condition <br />prior to map approval.) <br /> <br />76. SANITARY SEWER DESIGN STANDARDS: Connections to the City’s sanitary <br />sewer network shall conform to Pleasanton Municipal Code Title 15 “Sewerage”. <br />All buildings inhabited by human beings which are not more than 250 feet from <br />the City’s sewer network shall be connected. All premises, parcels, and/or lots <br />shall have independent connections to the City’s sewer network. The public <br />sanitary sewer system shall be designed to satisfy the following minimum <br />standards: <br /> <br />Minimum Manning Coefficient (n) within the pipe = 0.013 <br />Minimum flow velocity = 2 feet per second at least once per day <br />Maximum flow velocity = 10 feet per second
The URL can be used to link to this page
Your browser does not support the video tag.