Laserfiche WebLink
Front Elevation 5XC - Contemporary Farmhouse <br />6:12 <br />6:12 <br />6: <br />1 <br />2 <br />6: <br />1 <br />2 <br />4:12 <br />3.5:12at opt. outdoor room <br />RI <br />D <br />G <br />E <br />RIDGE <br />RI <br />D <br />G <br />E <br />6: <br />1 <br />2 <br />6: <br />1 <br />2 <br />ROOF PLAN <br />OVERHANG : 12"RAKE : 6"6:12 U.N.OROOF PITCH : <br />4:12 <br />VA <br />L <br />L <br />E <br />Y <br />VALLEY <br />VALLEY <br />VA <br />L <br />L <br />E <br />Y <br />4: <br />1 <br />2 <br />HI <br />P <br />6:12 <br />6:12 <br />Right Elevation <br />Entry <br />Porch <br />Pdr. <br />UP <br />17R <br />10 <br />' <br />- <br />0 <br />" <br />418'-6" x 15'-4" <br />A5.9PLAN 5XC - EXT. ELEVATIONS <br />0 2 4 8 <br />Architecture + Planning <br />888.456.5849 <br />ktgy.com # <br />ARROYO LAGO - 50X70 LOTS <br />ALAMEDA COUNTY, CA 2020-1091 <br />SCHEMATIC DESIGN <br />AUGUST 17, 2022 <br />330 LAND COMPANY, LLC <br />3C - Material Legend: <br />Flat Concrete Tile Roofing <br />Stucco Finish <br />Cememtitious Lap Siding <br />Decorative Gable End Detail <br />Enhanced Head and Sill Trim <br />Metal Roofing <br />0 4 8 16