private property to the east of the Project Site), as further shown in attached DA Exhibit D-1 <br /> and DA Exhibit D-2 (the "Maintenance CFD"). The Parties shall formally commence this <br /> formation process promptly upon completion of annexation, and shall work collaboratively and <br /> with diligence and good faith to attempt to complete said formation process within six (6) months <br /> thereafter or within such other reasonable time frame agreed upon by the Parties. Formation of <br /> said Maintenance CFD shall occur prior to issuance of the building permit for the first residential <br /> unit. At Developer's request, the Parties shall also cooperate to process, consider and form a <br /> facilities CFD (the "Facilities CFD"). The combined total effective special tax rate for the <br /> Maintenance and Facilities CFDs shall not exceed one and one half percent (1.5%) of the total <br /> tax burden on each home. Furthermore, to the extent all or a portion of the Project's <br /> landscaping obligations are covered by the Project's Homeowners' Association ("HOA"), then <br /> the amount of said obligations shall be correspondingly reduced in the Maintenance CFD. If <br /> City fails to approve the foregoing CFD formation despite Developer's cooperation in this <br /> regard, Developer shall have no further obligations under this subsection (f). Notwithstanding <br /> anything to the contrary in the foregoing, the Parties agree that City shall be under no obligation <br /> to accept Project improvements until the Maintenance CFD is formed. <br /> g. Pursuant to the timing set forth in the Project Approvals, Developer shall <br /> fund and construct the Off-site Water Improvements and the Off-site Sewer Improvements, as <br /> identified on attached DA Exhibits E and F, respectively, and consisting of the following: i) <br /> installation of a looped water distribution system that complies with the Planning and Design <br /> Criteria Summary presented in Table ES.1 of the City's Water Distribution System Capacity <br /> Master Plan dated May 2024, as further delineated in the Water Report, and ii) sizing of <br /> existing downstream sewer lines as described in Section 6.2.2 (Scenario 2, Option A: CIP) in <br /> the Sewer Report by Woodard & Curran Collectively, the foregoing shall be referred to herein <br /> as the "Off-site Water and Sewer Improvements"). <br /> Based on the increased infrastructure demand created by the Project, in combination with <br /> demand from other unrelated developments, Developer shall be responsible for its fair share <br /> costs of the Off-site Water and Sewer Improvements as set forth in this Section 3.2(g). Since <br /> Developer will be funding and constructing the Off-site Water and Sewer Improvements and <br /> because such improvements also provide a benefit to third parties (each, a "Benefitting <br /> Developer"), then Developer shall receive City connection fee credits for the total cost <br /> (including both hard and soft costs as evidenced by City-verified contractor invoicing) of the Off- <br /> site Water and Sewer Improvements. In addition, since City connection fee credits will not fully <br /> offset the costs of the Off-site Water and Sewer Improvements, Developer shall also be <br /> reimbursed by City via funds from any and all supplemental fair share payments made to City by <br /> other Benefitting Developers (e.g., Kiewit Developer, with respect to the Off-site Sewer <br /> Improvements). Furthermore, to the extent that Developer has not been fully reimbursed for the <br /> foregoing costs via fee credits and the foregoing reimbursement via City-collected fees, <br /> Developer also shall have the right to be reimbursed directly from other Benefitting Developers <br /> via reimbursement agreements with said Benefitting Developers ("Third-Party <br /> Reimbursement"). City shall facilitate such Third-Party Reimbursement by imposing <br /> condition(s) of approval on development applications that benefit from the installation of the Off- <br /> site Water Improvements and/or Off-site Sewer Improvements submitted by such Benefitting <br /> Developers. The amount due by such Benefitting Developers shall be calculated based on a <br /> fair share methodology consistent with the assumptions used in the Off-Site Water Report (as <br /> set forth in attached DA Exhibit E) and Off-Site Sewer Report (as set forth in DA Exhibit F). <br /> h. A monetary contribution to City that shall be used by City for the purpose <br /> of designing and constructing El Charro Road improvements in order to improve traffic <br /> 11 <br />