Laserfiche WebLink
D. Mitigation plans to address the suppression of airborne dust.vermin abatement,and <br /> erosion control measures during project grading required by PUD-50-OIM and made <br /> apart of Tract 7721. Before mass grading begins a Community Meeting must be held <br /> to discuss these mitigations plans with the neighborhood. <br /> E. Good neighbor letter to inform residents and property owners within 1,000 feet of the <br /> site regarding the mass grading. Such letter must first be submitted to the City for <br /> review and approval and must include Developer and contractor contact numbers for <br /> residents' concerns. This letter shall be used to invite residents and property owners <br /> to the Community Meeting. <br /> F. Tree preservation as required by PUD-50-01 M. <br /> G. All grading and other construction activities, inspections,plan checking,material <br /> delivery, staff assignment or coordination,etc.,shall be limited to the hours of 8:00 <br /> a.m. to 5:00 p.m., Monday through Friday. Prior to grading beginning,the hours of <br /> grading and other construction shall be posted on site. (PUD-50-01M) This posting <br /> shall include Developer and contractor contact numbers for residents' concerns. <br /> H. Thirty days before grading begins,the project developer shall have the site surveyed <br /> by a licensed biological consultant for the presence of burrowing owls,nesting <br /> raptors, Canadian geese, and other protected species. The biological consultant shall <br /> submit its written finding to the Director of Community Development before grading <br /> begins. If,however,these species are present,the project developer shall not begin <br /> grading and shall submit a mitigation plan to the Director of Community <br /> Development for implementation before grading begins. (PUD-50-01M) <br /> I. If any prehistoric or historic artifacts, or other indication of cultural resources are <br /> found once the project construction is underway, all work must stop within 20 meters <br /> (66 feet)of the find. A qualified archaeologist shall be consulted for an immediate <br /> evaluation of the find prior to resuming groundbreaking construction activities within <br /> 20 meters of the find. If the find is determined to be an important archaeological <br /> resource,the resource shall be either avoided, if feasible,or recovered consistent with <br /> the requirements of Appendix K of the State CEQA Guidelines. In the event of <br /> discovery or recognition of any human remains in any on-site location,there shall be <br /> no further excavation or disturbance of the site or any nearby area reasonably <br /> suspected to overlie adjacent remains until the County coroner has determined,in <br /> accordance with any law concerning investigation of the circumstances,the manner <br /> and cause of death and has made recommendations concerning treatment and <br /> dispositions of the human remains to the person responsible for the excavation,or to <br /> his/her authorized representative. (PUD-50-01M) <br /> J. Planning Division approval is required before any changes are implemented in site <br /> grading. (PUD-50-01M) <br /> Early Grading Agreement-Tract 7721 Page 2 of 7 <br />