My WebLink
|
Help
|
About
|
Sign Out
_Agenda_Packet_092826
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
BICYCLE PEDESTRIAN AND TRAILS
>
AGENDA PACKETS
>
2026
>
092826
>
_Agenda_Packet_092826
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2026 3:28:31 PM
Creation date
9/24/2026 3:25:29 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/28/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
04 <br />48 | 2026 PLEASANTON BICYCLE AND PEDESTRIAN MASTER PLAN <br />EXISTING CONDITIONS AND NETWORK EVALUATION <br />The results of the safety, and LTS analyses were synthesized to identify the primary safety, comfort, and connectivity needs <br />along the Focus Network. The needs assessment considered corridor conditions, key barriers, crash history, and opportunities <br />to improve connections to important destinations. The findings identified locations where targeted infrastructure improvements <br />could most effectively reduce barriers to walking and bicycling and informed the recommended improvements to the bicycle <br />and pedestrian network presented in Chapter 4. The technical findings also served as an input to the project prioritization pro- <br />cess described in Chapter 6.
The URL can be used to link to this page
Your browser does not support the video tag.