Laserfiche WebLink
64 | 2026 PLEASANTON BICYCLE AND PEDESTRIAN MASTER PLAN <br />RECOMMENDED NETWORK IMPROVEMENTS 05IDStreetRecommendation <br />50 Bernal Ave at Sunol Blvd Decrease crossing distance. <br />51 Main St at Old Bernal Ave Install RRFB or stop control if warrants are met. <br />52 Main St at Abbie St Install RRFB or stop control if warrants are met. <br />53 Main St at Division St Add traffic control to Main St crossing. <br />54 Main St at Spring St Add traffic control to Main St crossing. <br />55 Kottinger Dr at First St Implement signal adjustments to limit turning movements during <br />the crossing phase. <br />56 Kottinger Dr at Bernal Ave Decrease crossing distance on Bernal Ave. <br />57 Valley Ave at Busch Rd <br />Install marked crosswalks on both Valley Ave approaches, decrease <br />crossing distance (all approaches), and implement signal adjust- <br />ments to limit turning movements during the crossing phase. <br />58 Valley Ave at Stanley Blvd Implement signal adjustments to limit turning movements during <br />the pedestrian phase. Decrease crossing distance. <br />The recommended improvements identified in this chapter provide the foundation for future implementation. Chapter 6 describes <br />the prioritization framework, implementation timeframes, funding opportunities, and performance measures that will guide future <br />investments. <br />Table 4: Pedestrian Network Recommendations (Cont.)