My WebLink
|
Help
|
About
|
Sign Out
_Agenda_Packet_092826
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
BICYCLE PEDESTRIAN AND TRAILS
>
AGENDA PACKETS
>
2026
>
092826
>
_Agenda_Packet_092826
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2026 3:28:31 PM
Creation date
9/24/2026 3:25:29 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/28/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
64 | 2026 PLEASANTON BICYCLE AND PEDESTRIAN MASTER PLAN <br />RECOMMENDED NETWORK IMPROVEMENTS 05IDStreetRecommendation <br />50 Bernal Ave at Sunol Blvd Decrease crossing distance. <br />51 Main St at Old Bernal Ave Install RRFB or stop control if warrants are met. <br />52 Main St at Abbie St Install RRFB or stop control if warrants are met. <br />53 Main St at Division St Add traffic control to Main St crossing. <br />54 Main St at Spring St Add traffic control to Main St crossing. <br />55 Kottinger Dr at First St Implement signal adjustments to limit turning movements during <br />the crossing phase. <br />56 Kottinger Dr at Bernal Ave Decrease crossing distance on Bernal Ave. <br />57 Valley Ave at Busch Rd <br />Install marked crosswalks on both Valley Ave approaches, decrease <br />crossing distance (all approaches), and implement signal adjust- <br />ments to limit turning movements during the crossing phase. <br />58 Valley Ave at Stanley Blvd Implement signal adjustments to limit turning movements during <br />the pedestrian phase. Decrease crossing distance. <br />The recommended improvements identified in this chapter provide the foundation for future implementation. Chapter 6 describes <br />the prioritization framework, implementation timeframes, funding opportunities, and performance measures that will guide future <br />investments. <br />Table 4: Pedestrian Network Recommendations (Cont.)
The URL can be used to link to this page
Your browser does not support the video tag.